Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Address | 5 Arlington Square, Bracknell, RG12 1WA | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Operator | Centrilogic | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Website | https://www.centrilogic.com/bracknell-united-kingdom-data-center/ | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Building footprint | 2,465 m² (building) | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 51.4167, -0.7585 | OpenStreetMap data centers · record · ODbL 1.0 · checked 24 Oct 2026 |
Research on this data center and its operator.Who owns it up to the parent company, its power supply, grid connection and planning status, and an introduction to the operator.
Request researchNearby
Within 50 km of this data center: 276 power plants (97 operating, 1,196 MW), 225 substations and 152 grid connections (77 operating, 797 MW), measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Bracknell Primary | Substation | — | — | 0.4 km |
| Bracknell BSP | Substation | — | — | 0.4 km |
| Bracknell Forest Biomass Centre | Power plant | 1.1 MW | Cancelled | 0.5 km |
| Generation 19 MW grid connection at Western Road Generation | Grid connection | 19 MW | Operating | 0.6 km |
| Peacock Farm Primary | Substation | — | — | 1.8 km |
| Peakgen Bracknell grid connection | Grid connection | 19 MW | Operating | 1.9 km |
| Billingbear Solar Farm | Power plant | 21.5 MW | Permitted | 5.8 km |
| Land South of the Valentines grid connection | Grid connection | 17.9 MW | Planned | 5.9 km |
| Barkham Farms - Solar Farm | Power plant | 33 MW | Permitted | 8.3 km |
Operator and place
Other data centers in England
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.