CO2 emitter · Goes, Zeeland, Netherlands
Biomass heat Wolphaartsdijk (Noordhoek Broilers)
Biomass heat Wolphaartsdijk (Noordhoek Broilers) is a CO2 emitter in Goes, Zeeland, Netherlands, operated by Noordhoek Broilers B.V.
We hold more on this CO2 emitter.Grid operator: available on request.
Request this dataFacts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Goes | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Grid area | Available on request | Netbeheer Nederland capaciteitskaart · Restricted · checked 24 Oct 2026 |
| Address | Bokkeweg 6, 4471 RL Wolphaartsdijk | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Status | Operating | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Start year | 2018 | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Operator | Noordhoek Broilers B.V. | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Capacity | 1.2 MW | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Technology | Biomass heat | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Grid operator | Available on request | Netbeheer Nederland capaciteitskaart · Restricted · checked 24 Oct 2026 |
| Coordinates | 51.5277, 3.7910 | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
Know more about this CO2 emitter, or want an introduction to its operator? Ask us.
Nearby
Within 50 km of this CO2 emitter: 211 power plants (169 operating, 3,821 MW), 140 permit notices, 63 substations, 3 data centers and 1 processing plant, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Solar 's-Heer Arendskerke (CCE Solar Fields 1 NL) | Power plant | 2.44 MW | Operating | 3.3 km |
| Grid connection omgevingsvergunning application, Noord-Beveland (gmb-2025-139408) | Permit notice | — | — | 3.7 km |
| Nitrogen natuurvergunning draft decision, Noord-Beveland (prb-2026-14913) | Permit notice | — | — | 4.7 km |
| Nitrogen natuurvergunning application, Noord-Beveland (prb-2025-878) | Permit notice | — | — | 5.6 km |
| 150 kV Goes de Poel | Substation | — | — | 6.5 km |
| DELTA Fiber | Data center | — | — | 7.5 km |
| Solar Nieuwdorp Zld (Moerdijk Sorteer- en Pakstation (M.S.P.)) | Power plant | 1.26 MW | Operating | 7.7 km |
| Solar Nieuwdorp Zld (Lineage Vlissingen PropCo) | Power plant | 5 MW | Operating | 7.9 km |
| Data Beheer Groep data center, Goes | Data center | — | — | 8.5 km |
Operator and place
Other CO2 emitters in Zeeland
Data on this page
- Netbeheer Nederland capaciteitskaart. Netbeheer Nederland capaciteitskaart, Restricted.
- Officiële Bekendmakingen. Officiële Bekendmakingen, CC0 1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.