Heat pump Rijen (Amalthea) is a planned CO2 emitter in Gilze en Rijen, North Brabant, Netherlands, operated by Amalthea B.V.
We hold more on this asset.Grid operator and location: available on request.
Request this dataFacts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Gilze en Rijen | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Grid area | Available on request | Netbeheer Nederland capaciteitskaart · Restricted · checked 24 Oct 2026 |
| Address | Markiezenbaan 5, 5121 DS Rijen | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Status | Planned (SDE subsidy granted, not yet in use) | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Operator | Amalthea B.V. | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Capacity | 1.25 MW | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Technology | Heat pump | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Grid operator | Available on request | Netbeheer Nederland capaciteitskaart · Restricted · checked 24 Oct 2026 |
| Coordinates | 51.5800, 4.9433 | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
Know more about this CO2 emitter, or want an introduction to its operator? Ask us.
Nearby
Within 50 km of this CO2 emitter: 532 power plants (434 operating, 4,142 MW), 325 permit notices, 81 substations, 9 data centers and 2 processing plants, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Battery storage omgevingsvergunning application, Gilze en Rijen (gmb-2026-115841) | Permit notice | — | — | 0.1 km |
| Battery storage omgevingsvergunning decision, Gilze en Rijen (gmb-2026-480414) | Permit notice | — | — | 0.1 km |
| Solar Rijen (Beheermaatschappij Zonnestroom Nederland 4) | Power plant | 1.31 MW | Cancelled | 0.4 km |
| Grid connection omgevingsvergunning decision, Gilze en Rijen (gmb-2025-227046) | Permit notice | — | — | 1.5 km |
| Biomass Rijen (Smits Energie) | Power plant | 4.9 MW | Operating | 2.3 km |
| Solar Rijen (One Solar XVIII) | Power plant | 1.9 MW | Operating | 2.3 km |
| 150 kV Tilburg West | Substation | — | — | 6.1 km |
| 150 kV Oosteind | Substation | — | — | 7.5 km |
| 150 kV Tilburg Zuid | Substation | — | — | 8.9 km |
Operator and place
Other CO2 emitters in North Brabant
- Aquathermal heat Terheijden (Eerste Traais Warmtebedrijf)
- Biomass heat 's-Hertogenbosch (Heineken Netherlands Supply)
- Biomass heat 's-Hertogenbosch (Waterschap Aa en Maas)
- Biomass heat Boxtel (Hydreco)
- Biomass heat Breda (Ennatuurlijk Warmteproductie & Assets)
- Biomass heat Breda (Ennatuurlijk)
- Biomass heat Breda (Eteck)
- Biomass heat Goirle (VP Energie)
Data on this page
- Netbeheer Nederland capaciteitskaart. Netbeheer Nederland capaciteitskaart, Restricted.
- Officiële Bekendmakingen. Officiële Bekendmakingen, CC0 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.