Substation · North Brabant, Netherlands
150 kV substation (OSM way/1196791218)
150 kV substation (OSM way/1196791218) is a substation in North Brabant, Netherlands.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | North Brabant | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Voltage | 150 kV | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Coordinates | 51.7098, 4.8399 | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
Research on this substation and its owner.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the owner.
Request researchNearby
Within 50 km of this substation: 684 power plants (539 operating, 7,492 MW), 499 permit notices, 86 CO2 emitters (51 operating), 14 data centers and 3 processing plants, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Biomass co-firing Geertruidenberg (RWE Generation NL) | Power plant | 676 MW | Operating | 0.1 km |
| Solar Geertruidenberg (RWE Solar Netherlands) | Power plant | 7.66 MW | Operating | 0.1 km |
| RWE Amercentrale | CO2 emitter | 175,529 tCO2e | — | 0.3 km |
| Nitrogen natuurvergunning draft decision, Geertruidenberg (prb-2026-9243) | Permit notice | — | — | 0.3 km |
| Amercentrale | Power plant | 631 MW | Operating | 0.3 km |
| Substation omgevingsvergunning application, Geertruidenberg (gmb-2024-537165) | Permit notice | — | — | 1.3 km |
| Substation omgevingsvergunning decision, Geertruidenberg (gmb-2025-54313) | Permit notice | — | — | 1.3 km |
| Biomass heat Waspik (Facilitair) | CO2 emitter | — | Permitted | 7.2 km |
| Heat pump Waspik (Facilitair) | CO2 emitter | — | Cancelled | 7.2 km |
Place
Candidate sites around this substation
13 sites of land near 150 kV substation (OSM way/1196791218) have it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.
- 87 ha site at Geertruidenberg A 40800.0 km · score 60
- 209 ha site at Made en Drimmelen L 822, Drimmelen0.52 km · score 57
- 89 ha site at Made en Drimmelen L 823, Drimmelen0.35 km · score 56
- 46 ha site at Geertruidenberg A 34830.03 km · score 50
- 49 ha site at Dussen U 333, Altena0.33 km · score 46
- 48 ha site at Raamsdonk K 683, Geertruidenberg0.36 km · score 45
- 62 ha site at Made en Drimmelen L 769, Drimmelen0.67 km · score 44
- 377 ha site at Made en Drimmelen L 804, Drimmelen1.57 km · score 41
- 44 ha site at Made en Drimmelen L 770, Drimmelen0.84 km · score 37
- 46 ha site at Dussen U 193, Altena0.99 km · score 35
- 39 ha site at Dussen U 99, Altena1.13 km · score 32
- 31 ha site at Raamsdonk K 4189, Geertruidenberg1.01 km · score 31
Other substations in North Brabant
Data on this page
- European Commission, Union Registry. EU Union Registry public data, CC BY 4.0.
- JRC Open Power Plants Database (JRC-PPDB-OPEN), European Commission, Joint Research Centre. JRC Open Power Plants Database (JRC-PPDB-OPEN), CC BY 4.0.
- Dutch power station owners' and operators' pages. Dutch power station owners' and operators' pages, Facts only, each linked to its page.
- Officiële Bekendmakingen. Officiële Bekendmakingen, CC0 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.