Substation · Bad Lauchstädt, Saxony-Anhalt, Germany

Umspannstation Schotterey

Umspannstation Schotterey is a 110 kV substation in Bad Lauchstädt, Saxony-Anhalt, Germany, connected by Umspannwerk Große Schanze GmbH & Co. OHG.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBad Lauchstädt (point in boundary)BKG Verwaltungsgebiete 1:250 000 (VG250) · DL-DE-BY-2.0 · checked 25 Oct 2026
LocationSaxony-AnhaltOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Grid operatorUmspannwerk Große Schanze GmbH & Co. OHGOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Voltage110 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Coordinates51.4204, 11.8349OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Request research

Nearby

Within 50 km of this substation: 190 power plants (135 operating, 4,970 MW), 12 CO2 emitters (8,144,582 tCO2e), 2 data centers and 1 processing plant, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Energiepark Bad LauchstädtPower plant49.6 MWOperating2.3 km
Windpark HollebenPower plant25.5 MWOperating3.1 km
TeutschenthalPower plant36.3 MWOperating3.3 km
Kraftwerk SchkopauCO2 emitter3,958,812 tCO2e—8.2 km
GuD-Anlage DieselstraßeCO2 emitter186,674 tCO2e—12 km
Raffineriekraftwerk LeunaCO2 emitter855,614 tCO2e—16 km
UniversitätsrechenzentrumData center——39 km
European Lithium Refining and Recycling Hub Bitterfeld: from primary raw materials via recycling to critical solid state battery componentsProcessing plant——39 km
Neubau KI-RechenzentrumData center—Under construction41 km

Grid operator and place

Other substations in Saxony-Anhalt

All 286 substations in Saxony-Anhalt, Germany