Substation · Coswig (Anhalt), Saxony-Anhalt, Germany
Umspannstation Luko
Umspannstation Luko is a 110 kV substation in Coswig (Anhalt), Saxony-Anhalt, Germany, connected by Windpark Luko GmbH.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Saxony-Anhalt | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Location | Coswig (Anhalt) (point in boundary) | BKG Verwaltungsgebiete 1:250 000 (VG250) · DL-DE-BY-2.0 · checked 25 Oct 2026 |
| Grid operator | Windpark Luko GmbH | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Voltage | 110 kV | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Coordinates | 51.9301, 12.3240 | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.
Request researchNearby
Within 50 km of this substation: 131 power plants (97 operating, 2,323 MW), 5 CO2 emitters (3,303,190 tCO2e), 1 processing plant and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Windpark Luko GmbH & Co. KG | Power plant | 30.4 MW | Operating | 1.4 km |
| PV Reuden Süd | Power plant | 16 MW | Operating | 13 km |
| Photovoltaikpark Oranienbaum | Power plant | 11.8 MW | Operating | 13 km |
| Ammoniakanlage 1 | CO2 emitter | 1,000,702 tCO2e | — | 18 km |
| Ammoniakanlage 2 | CO2 emitter | 1,112,586 tCO2e | — | 18 km |
| European Lithium Refining and Recycling Hub Bitterfeld: from primary raw materials via recycling to critical solid state battery components | Processing plant | — | — | 31 km |
| Solvay Chemicals GmbH | CO2 emitter | 294,587 tCO2e | — | 42 km |
| T-Systems Biere Rechenzentrum | Data center | — | — | 46 km |
Grid operator and place
Candidate sites around this substation
2 sites of land near Umspannstation Luko have it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.
- 91 ha site at Gemarkung Roßlau, Flur 13, Flurstück 131.84 km · score 43
- 50 ha site at Gemarkung Luko, Flur 5, Flurstück 101.16 km · score 40
Other substations in Saxony-Anhalt
Data on this page
- © BKG (2026) dl-de/by-2-0, Datenquellen: https://sg.geodatenzentrum.de/web_public/gdz/datenquellen/datenquellen_vg_nuts.pdf. BKG Verwaltungsgebiete 1:250 000 (VG250), DL-DE-BY-2.0.
- © European Union, European Commission (DG GROW). EU CRMA strategic projects, CC BY 4.0.
- European Commission, Union Registry. EU Union Registry public data, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.