Substation · Aachen, North Rhine-Westphalia, Germany

110 kV substation (OSM way/24507400)

110 kV substation (OSM way/24507400) is a substation in Aachen, North Rhine-Westphalia, Germany, connected by Stawag – Stadt- und Städteregionswerke Aachen AG.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationAachen (point in boundary)BKG Verwaltungsgebiete 1:250 000 (VG250) · DL-DE-BY-2.0 · checked 25 Oct 2026
LocationNorth Rhine-WestphaliaOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Grid operatorStawag – Stadt- und Städteregionswerke Aachen AGOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Voltage110 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Coordinates50.7963, 6.1121OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Request research

Nearby

Within 50 km of this substation: 238 power plants (148 operating, 10,454 MW), 185 permit notices, 11 CO2 emitters (3 operating), 8 data centers and 1 processing plant, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
EURaix EvolutionData center——0.1 km
hex/ACData center——2.1 km
EURaixData center——2.5 km
EU BEST STRAT: Battery Economical Sustainable (Recycling-) TechnologyProcessing plant——3.3 km
Windpark Würselen RepoweringPower plant18 MWOperating5.1 km
Battery storage omgevingsvergunning application, Heerlen (gmb-2026-376025)Permit notice——7.1 km
Battery storage omgevingsvergunning decision, Heerlen (gmb-2026-406677)Permit notice——7.1 km
Solar Heerlen (AG Heylen Solar 21)Power plant3.54 MWOperating7.6 km
Windpark Aachen-Nord GmbH & Co. KGPower plant12.1 MWOperating7.7 km

Grid operator and place

More from Stawag – Stadt- und Städteregionswerke Aachen AG

Other substations in North Rhine-Westphalia

All 930 substations in North Rhine-Westphalia, Germany

Data on this page