Umspannwerk Kerken is a 110 kV substation in Kerken, North Rhine-Westphalia, Germany, connected by SL Windenergie GmbH.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Kerken (point in boundary) | BKG Verwaltungsgebiete 1:250 000 (VG250) · DL-DE-BY-2.0 · checked 25 Oct 2026 |
| Location | North Rhine-Westphalia | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Grid operator | SL Windenergie GmbH | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Voltage | 110 kV | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Coordinates | 51.4556, 6.3859 | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.
Request researchNearby
Within 50 km of this substation: 590 permit notices, 382 power plants (247 operating, 7,816 MW), 39 CO2 emitters (14 operating), 11 data centers and 1 processing plant, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Rheurdt | Power plant | 28.2 MW | Planned | 4.3 km |
| Vorster Feld | Power plant | 24 MW | Operating | 4.4 km |
| Kerken-Eyll | Power plant | 54.6 MW | Operating | 5.5 km |
| Biomass heat Lomm (Aviko B.V. (Locatie Lomm)) | CO2 emitter | — | Operating | 14 km |
| Nitrogen natuurvergunning application, Venlo (prb-2025-17579) | Permit notice | — | — | 14 km |
| Nitrogen natuurvergunning decision, Venlo (prb-2026-14951) | Permit notice | — | — | 14 km |
| Nitrogen natuurvergunning draft decision, Venlo (prb-2026-10945) | Permit notice | — | — | 14 km |
| Systemec Venlo DC25 | Data center | — | — | 18 km |
| Systemec Venlo DC19 | Data center | — | — | 18 km |
Grid operator and place
More from SL Windenergie GmbH
- Rheurdt28.2 MW · planned
- Wachtendonk Wankum23.2 MW · planned
- Wesel Perrich18.1 MW · planned
- Finnentrop-Schöndelt18 MW · planned
- Coesfeld Letter Bruch17.1 MW · planned
- Hamminkeln15 MW · planned
- Windpark Finnentrop-Ramscheid12.6 MW · planned
- Finnentrop-Hesenberg12 MW · planned
Other substations in North Rhine-Westphalia
Data on this page
- © BKG (2026) dl-de/by-2-0, Datenquellen: https://sg.geodatenzentrum.de/web_public/gdz/datenquellen/datenquellen_vg_nuts.pdf. BKG Verwaltungsgebiete 1:250 000 (VG250), DL-DE-BY-2.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Officiële Bekendmakingen. Officiële Bekendmakingen, CC0 1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.