Substation · Datteln, North Rhine-Westphalia, Germany
Schaltanlage Datteln 4
Schaltanlage Datteln 4 is a 380 kV substation in Datteln, North Rhine-Westphalia, Germany, connected by Uniper Kraftwerke GmbH.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Datteln (point in boundary) | BKG Verwaltungsgebiete 1:250 000 (VG250) · DL-DE-BY-2.0 · checked 25 Oct 2026 |
| Location | North Rhine-Westphalia | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Grid operator | Uniper Kraftwerke GmbH | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Voltage | 380 kV | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Coordinates | 51.6322, 7.3389 | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.
Request researchNearby
Within 50 km of this substation: 155 power plants (77 operating, 3,992 MW), 30 CO2 emitters (33,009,990 tCO2e), 8 data centers and 3 processing plants, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Datteln 4 | Power plant | 1,052 MW | Operating | 0.2 km |
| Kraftwerk Datteln Block 4 | CO2 emitter | 2,875,406 tCO2e | — | 0.2 km |
| WP Datteln | Power plant | 11.4 MW | Operating | 1.1 km |
| Biomass Heizkraftwerk Recklinghausen | Power plant | 18 MW | Operating | 6.8 km |
| Kohlekraftwerk Lünen - TKL | CO2 emitter | 2,319,858 tCO2e | — | 8.9 km |
| Second TBRC Lünen | Processing plant | — | — | 12 km |
| Anlage zur Herstellung von Furnaceruss | CO2 emitter | 258,542 tCO2e | — | 12 km |
| RZ5 Dortmund-Huckarde | Data center | — | — | 12 km |
| Data center, Dortmund (OSM way 54821769) | Data center | — | — | 16 km |
Grid operator and place
More from Uniper Kraftwerke GmbH
- Hemfurthsubstation
- Kraftwerk Irsching Block 4727,007 tCO2e
- Kraftwerk Irsching700,405 tCO2e
- Kraftwerk Scholven445,203 tCO2e
- Kraftwerk Staudinger261,600 tCO2e
- Kraftwerk Kirchmöser240,729 tCO2e
- Franken823 MW
- Scholven 2 GT579 MW · planned
Other substations in North Rhine-Westphalia
Data on this page
- © BKG (2026) dl-de/by-2-0, Datenquellen: https://sg.geodatenzentrum.de/web_public/gdz/datenquellen/datenquellen_vg_nuts.pdf. BKG Verwaltungsgebiete 1:250 000 (VG250), DL-DE-BY-2.0.
- © European Union, European Commission (DG GROW). EU CRMA strategic projects, CC BY 4.0.
- European Commission, Union Registry. EU Union Registry public data, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.