Substation · Lower Saxony, Germany
Hildesheim Süd
Hildesheim Süd is a 110 kV substation in Lower Saxony, Germany, connected by Avacon Netz GmbH.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Lower Saxony | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Grid operator | Avacon Netz GmbH | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Voltage | 110 kV | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Coordinates | 52.1138, 9.9357 | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
Research on this substation and its grid operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the grid operator.
Request researchNearby
Within 50 km of this substation: 106 power plants (66 operating, 2,067 MW), 11 data centers and 9 CO2 emitters (9,423,640 tCO2e), measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| ABO Energy WP Almstedt-Breinum II | Power plant | 11.1 MW | Planned | 8.0 km |
| Windenergie Koppelberg GmbH & Co. KG | Power plant | 10.4 MW | Operating | 8.2 km |
| WP Harsum-Schellerten | Power plant | 15.6 MW | Operating | 9.6 km |
| Kalkbrennanlage Nordstemmen | CO2 emitter | 180,188 tCO2e | — | 12 km |
| Avacon AG Data Center Sehnde | Data center | — | — | 23 km |
| PoP-Hauptverteiler | Data center | — | — | 24 km |
| Telekom Vermittlungsstelle | Data center | — | — | 24 km |
| Werk Höver | CO2 emitter | 482,790 tCO2e | — | 27 km |
| Heizkraftwerk Linden | CO2 emitter | 234,062 tCO2e | — | 33 km |
Grid operator and place
More from Avacon Netz GmbH
Candidate sites around this substation
3 sites of land near Hildesheim Süd have it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.
- 92 ha site at Gemarkung Hildesheimer Wald, Flur 3, Flurstück 7/71.63 km · score 47
- 54 ha site at Gemarkung Hildesheimer Wald, Flur 3, Flurstück 4/131.59 km · score 34
- 54 ha site at Gemarkung Ziegenberg, Flur 1, Flurstück 1/21.98 km · score 27
Other substations in Lower Saxony
- 110 kV substation (OSM node/924018211)
- 110 kV substation (OSM way/1016436315)
- 110 kV substation (OSM way/1021637039)
- 110 kV substation (OSM way/1023904136)
- 110 kV substation (OSM way/1034844279)
- 110 kV substation (OSM way/1087945281)
- 110 kV substation (OSM way/1098352996)
- 110 kV substation (OSM way/1126924534)
Data on this page
- European Commission, Union Registry. EU Union Registry public data, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.