Substation · Hesse, Germany

Allendorf/Winter

Allendorf/Winter is a 110 kV substation in Hesse, Germany, connected by Fritz Winter Eisengießerei GmbH & Co. KG.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationHesseOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Grid operatorFritz Winter Eisengießerei GmbH & Co. KGOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Voltage110 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Coordinates50.8212, 9.0041OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026

Research on this substation and its grid operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the grid operator.

Request research

Nearby

Within 50 km of this substation: 98 power plants (50 operating, 1,608 MW) and 2 data centers, measured from the coordinates in the facts above. The table shows the nearest 5, up to 3 per kind.

NameKindSizeStatusDistance
WarthstrauchPower plant17.1 MWPlanned3.6 km
LangensteinPower plant27.2 MWPlanned4.1 km
Windpark HopfenbergPower plant16.7 MWOperating4.5 km
ekom21Data center——35 km
General Logistics Systems Germany GmbH & Co. OHGData center——42 km

Grid operator and place

Candidate sites around this substation

2 sites of land near Allendorf/Winter have it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.

Other substations in Hesse

All 316 substations in Hesse, Germany

Data on this page