Substation · Brandenburg, Germany

Waldow/Tornow

Waldow/Tornow is a 110 kV substation in Brandenburg, Germany, connected by NOTUS.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBrandenburgOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Grid operatorNOTUSOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Voltage110 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Coordinates52.1168, 13.6429OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026

Research on this substation and its grid operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the grid operator.

Request research

Nearby

Within 50 km of this substation: 121 power plants (79 operating, 2,626 MW), 10 data centers and 4 CO2 emitters (2,469,215 tCO2e), measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
KWK BaruthPower plant17.5 MWOperating10.0 km
Windpark Waldow - Repowering IPower plant17.2 MWOperating15 km
Windpark Freiwalde NordPower plant11 MWOperating15 km
Vantage Berlin II (BER2)Data center——17 km
BER11Data center——33 km
Data center, Ludwigsfelde (OSM way 1251320341)Data center——33 km
HKW KlingenbergCO2 emitter488,884 tCO2e—43 km
Zementwerk RüdersdorfCO2 emitter784,737 tCO2e—43 km
HKW MarzahnCO2 emitter533,554 tCO2e—46 km