Substation · Beeskow, Brandenburg, Germany

Umspannwerk Groß Rietz (Groß Rietz substation)

Umspannwerk Groß Rietz is a 110 kV substation in Beeskow, Brandenburg, Germany, connected by enercity AG.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBrandenburgOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
LocationBeeskow (point in boundary)BKG Verwaltungsgebiete 1:250 000 (VG250) · DL-DE-BY-2.0 · checked 25 Oct 2026
Grid operatorenercity AGOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Voltage110 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Coordinates52.1821, 14.2099OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Request research

Nearby

Within 50 km of this substation: 138 power plants (87 operating, 2,526 MW), 2 CO2 emitters (2,688,582 tCO2e), 1 data center and 1 processing plant, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Sonae Arauco Beeskow GmbHPower plant15.8 MWOperating3.2 km
Buckow-BirkholzPower plant21 MWOperating3.6 km
WP Beeskow-NeuendorfPower plant74.5 MWOperating3.9 km
Dampfheizkraftwerk VEOCO2 emitter1,903,845 tCO2e—29 km
Zementwerk RüdersdorfCO2 emitter784,737 tCO2e—43 km
Vantage Berlin II (BER2)Data center——44 km
Lithium Hydroxide Converter GubenProcessing plant——44 km

Grid operator and place

More from enercity AG

Other substations in Brandenburg

All 429 substations in Brandenburg, Germany

Data on this page