Substation · Baden-Württemberg, Germany
Umspannwerk Nagold
Umspannwerk Nagold is a 110 kV substation in Baden-Württemberg, Germany, connected by Netze BW GmbH.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Baden-Württemberg | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Grid operator | Netze BW GmbH | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Voltage | 110 kV | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Coordinates | 48.5611, 8.6991 | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
Research on this substation and its grid operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the grid operator.
Request researchNearby
Within 50 km of this substation: 31 power plants (18 operating, 458 MW), 2 data centers, 2 CO2 emitters (331,936 tCO2e), 1 AI supercomputer and 1 processing plant, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Lindenrain | Power plant | 13.6 MW | Planned | 14 km |
| Lindenrain | Power plant | 34 MW | Planned | 15 km |
| WP Nordschwarzwald | Power plant | 10 MW | Operating | 18 km |
| Höchstleistungsrechenzentrum der Universität Stuttgart | Data center | — | — | 35 km |
| High-Performance Computing Center Stuttgart Hawk | AI supercomputer | 61 H100e | Operating | 35 km |
| Anlage zum Brennen von Ölschiefer - Blöcke 1bis 4 | CO2 emitter | 165,954 tCO2e | — | 37 km |
| Nepustil RZ4 | Data center | — | — | 38 km |
| HyProMag GmbH | Processing plant | — | — | 38 km |
| Kraftwerk Stuttgart-Münster | CO2 emitter | 165,982 tCO2e | — | 47 km |
Grid operator and place
More from Netze BW GmbH
- 110 kV substation (OSM way/1008236043)substation
- 110 kV substation (OSM way/102614597)substation
- Umspannwerk Langenargensubstation
- Umspannwerk Weildorfsubstation
- Umspannwerk Tuttlingensubstation
- Umspannwerk Winterlingensubstation
- Umspannwerk Wolfsbergsubstation
- Umspannwerk Mudausubstation
Candidate sites around this substation
5 sites of land near Umspannwerk Nagold have it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.
- 247 ha site at Gemarkung Nagold, Flurstück 48700.1 km · score 78
- 200 ha site at Gemarkung Nagold, Flurstück 48731.36 km · score 56
- 64 ha site at Gemarkung Rohrdorf, Flurstück 8751.01 km · score 48
- 96 ha site at Gemarkung Walddorf, Flurstück 21861.81 km · score 45
- 52 ha site at Gemarkung Mindersbach, Flurstück 10181.25 km · score 40
Other substations in Baden-Württemberg
Data on this page
- Epoch AI. Epoch AI supercomputers, CC BY 4.0.
- © European Union, European Commission (DG GROW). EU CRMA strategic projects, CC BY 4.0.
- European Commission, Union Registry. EU Union Registry public data, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.