Substation · Baden-Württemberg, Germany
110-kV-Umspannwerk Hochstetten
110-kV-Umspannwerk Hochstetten is a substation in Baden-Württemberg, Germany, connected by Netze BW GmbH.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Baden-Württemberg | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Grid operator | Netze BW GmbH | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Voltage | 110 kV | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Coordinates | 49.1386, 8.4155 | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
Research on this substation and its grid operator.Who owns it up to the parent company, its headroom, congestion and the land around it, and an introduction to the grid operator.
Request researchNearby
Within 50 km of this substation: 32 power plants (24 operating, 540 MW), 15 data centers, 3 mines and 2 processing plants, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Scientific Computing Center | Data center | — | — | 4.9 km |
| ForHLR II | Data center | — | — | 4.9 km |
| TelemaxX IPC5 | Data center | — | — | 7.4 km |
| TG-1902 | Power plant | 14.6 MW | Operating | 11 km |
| CEE Windpark Gollenberg | Power plant | 19.8 MW | Operating | 13 km |
| Windpark Hatzenbühl | Power plant | 15 MW | Operating | 14 km |
| Zero Carbon Lithium | Mine | — | — | 23 km |
| Viridian Lithium | Processing plant | — | — | 27 km |
| HyProMag GmbH | Processing plant | — | — | 34 km |
Grid operator and place
More from Netze BW GmbH
- 110 kV substation (OSM way/1008236043)substation
- 110 kV substation (OSM way/102614597)substation
- Umspannwerk Langenargensubstation
- Umspannwerk Weildorfsubstation
- Umspannwerk Tuttlingensubstation
- Umspannwerk Winterlingensubstation
- Umspannwerk Wolfsbergsubstation
- Umspannwerk Mudausubstation
Candidate sites around this substation
5 sites of land near 110-kV-Umspannwerk Hochstetten have it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.
- 103 ha site at Gemarkung Graben, Flurstück 64091.41 km · score 55
- 61 ha site at Gemarkung Liedolsheim, Flurstück 36650.98 km · score 48
- 94 ha site at Gemarkung Linkenheim, Flurstück 16491.71 km · score 46
- 116 ha site at Gemarkung Liedolsheim, Flurstück 34991.99 km · score 45
- 65 ha site at Gemarkung Graben, Flurstück 64121.9 km · score 33
Other substations in Baden-Württemberg
Data on this page
- © European Union, European Commission (DG GROW). EU CRMA strategic projects, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.