PSE: informacje publikowane zgodnie z art. 7 ust. 8l ustawy Prawo energetyczne
The common list (Wykaz wspólny) of every request to connect to PSE's grid, about 890 rows, monthly: object, applicant, station, voltage (110/220/400 kV), installation type (PV, wind, offshore wind, storage, load, distribution grid, gas, nuclear ...), export and import MW and MW per technology, project status, and the dates of application, advance payment, connection conditions, refusal (with reason), expiry, agreement, energisation and termination; plus the list of switchyards with no free connection bay (requests there are refused) and, as PDF only, available capacity per node (almost all 0 MW) and national aggregates (Poland (transmission grid)). Rare Context derives facts from PSE: informacje publikowane zgodnie z art. 7 ust. 8l ustawy Prawo energetyczne under Restricted without republishing the data itself.
About this source
| Publisher's page | https://www.pse.pl/obszary-dzialalnosci/krajowy-system-elektroenergetyczny/wykaz-obiektow-planowanych-do-przylaczenia |
| Licence | Restricted |
| Credit | PSE: informacje publikowane zgodnie z art. 7 ust. 8l ustawy Prawo energetyczne |
| Licence terms | No licence on the files or the page, and no terms of use on pse.pl (no nota prawna or regulamin; /nota-prawna is 404). Published under a legal duty (Prawo energetyczne art. 7 ust. 8l), which is not a licence; not on dane.gov.pl. Restricted: claims are listed until PSE grants permission. Applicants who are natural persons or sole traders are not kept. Checked 2026-10-24. |
| Coverage | Poland (transmission grid) |
| Access | XLSX linked from the page (/documents/20182/51490/Informacje_publikowane_zgodnie_z_Art_7_ust_8l_ustawy_PE_stan_na_DD_MM_YYYY.xlsx and YYYYMMDD_Lista_rozdzielni-brak_mozliwosci_przylaczenia.xlsx), plain GET; file names carry the data date and cannot be guessed |
| Refresh | Monthly |
Download
Public claims as JSON Lines, one record per line. Listed claims carry no value. Every source's public claims together, as CSV, are in the open data download.
| File | Records | Updated | Last checked |
|---|---|---|---|
| connection_requests.jsonl | 11,432 | 24 Oct 2026 | 24 Oct 2026 |
Pages built from this source
Grid connections
- Blok 11 Elektrowni Kozienice: connection request at Kozienice 400 kV
- Blok 11 Elektrowni Turów: connection request at Mikułowa 400 kV
- Blok 4 i 5 w Elektrowni Konin (na biomasę): connection request at Konin 110 kV
- Blok 910 MW Elektrowni Jaworzno: connection request at Byczyna 400 kV
- Blok G-P CCGT w Płocku wraz z zasilaniem instalacji zakładu produkcyjnego Orlen S.A. w Płocku: connection request at Płock 400 kV
- Blok Gazowo - Parowy Adamów: connection request at Adamów 220 kV
- Blok Gazowo-Parowy CCGT Gdańsk: connection request at Gdańsk Błonia 400 kV
- Blok Gazowo-Parowy CCGT Gdańsk - zm. WP: connection request at Gdańsk Błonia 400 kV
Substations
We hold more from PSE: informacje publikowane zgodnie z art. 7 ust. 8l ustawy Prawo energetyczne.9,917 facts we may not republish, such as capacity, grid operator and location: available on request.
Request this dataData on this page
- PSE: informacje publikowane zgodnie z art. 7 ust. 8l ustawy Prawo energetyczne. PSE: informacje publikowane zgodnie z art. 7 ust. 8l ustawy Prawo energetyczne, Restricted.