Source · MISO
MISO generator interconnection queue
Every generator interconnection request: project number, queue date, study cycle and phase, transmission owner, state, county, POI, summer and winter MW, fuel, facility type, status (MISO). Rare Context derives facts from MISO generator interconnection queue under MISO Terms of Use without republishing the data itself.
About this source
| Publisher's page | https://www.misoenergy.org/planning/resource-utilization/GI_Queue/gi-interactive-queue/ |
| Licence | MISO Terms of Use |
| Credit | MISO generator interconnection queue |
| Licence terms | MISO Terms of Use (https://www.misoenergy.org/meet-miso/legal-and-privacy/): "You are not permitted to modify, publish, transmit, participate in the transfer or sale of, reproduce, create derivative works of, distribute, publicly perform, publicly display or in any way exploit any of the materials or content on this Website". Listed only. Checked 2026-10-24 |
| Coverage | MISO |
| Access | JSON behind the interactive queue (https://www.misoenergy.org/api/giqueue/getprojects) |
| Refresh | Weekly |
Download
Public claims as JSON Lines, one record per line. Listed claims carry no value. Every source's public claims together, as CSV, are in the open data download.
| File | Records | Updated | Last checked |
|---|---|---|---|
| queue.jsonl | 10,827 | 24 Oct 2026 | 24 Oct 2026 |
Pages built from this source
- Grid connections1,285
Grid connections
We hold more from MISO generator interconnection queue.8,748 facts we may not republish, such as location, grid operator and status: available on request.
Request this dataData on this page
- MISO generator interconnection queue. MISO generator interconnection queue, MISO Terms of Use.