Source · GB
GB power station owners' pages
End-of-generation dates of GB power stations that their owners announce (EDF's nuclear fleet), each with the page that states it (GB). Rare Context republishes 5 facts from GB power station owners' pages under Facts only, each linked to its page, linked to owners and places.
About this source
| Publisher's page | https://www.edfenergy.com/media-centre/2025-fleet-update |
| Licence | Facts only, each linked to its page |
| Credit | GB power station owners' pages |
| Licence terms | Facts only, each linked to its page: no text, figures or images are copied. A planned closing date is a fact, not protected by copyright, and a few facts read from a company's web page are not a substantial part of a database. Credit each page as the claim's source. Reviewed 2026-10-24 |
| Coverage | GB |
| Access | Reviewed by hand in pipeline/collectors/desnz-dukes.json (one URL per fact); the DUKES collector writes them with the stations |
| Refresh | Quarterly |
Download
Public claims as JSON Lines, one record per line. Listed claims carry no value. Every source's public claims together, as CSV, are in the open data download.
| File | Records | Updated | Last checked |
|---|
Pages built from this source
Power plants
- Heysham 21,240 MW
- Torness1,200 MW
- Sizewell B1,198 MW
- Hartlepool1,185 MW
- Heysham 11,060 MW
An extract from GB power station owners' pages.Its records for a place or owner you name, joined to the owners and grid data from our other sources: on request.
Request an extractData on this page
- GB power station owners' pages. GB power station owners' pages, Facts only, each linked to its page.