Source · Germany

Bundesbedarfsplangesetz and Energieleitungsausbaugesetz: project annexes

Every transmission grid expansion project the two acts declare needed: number, route (endpoints), AC or DC, nominal voltage, and the BBPlG § 2 designations (A1 cross-state, A2 cross-border, B HVDC pilot, C offshore connection, D high-temperature conductors, E underground cable priority, F underground cable pilot, G no federal sectoral planning, H empty conduits) (Germany). Rare Context republishes 559 facts from Bundesbedarfsplangesetz and Energieleitungsausbaugesetz: project annexes under Public domain, linked to owners and places.

About this source

Publisher's pagehttps://www.gesetze-im-internet.de/bbplg/BJNR254310013BJNE000611377.html
LicencePublic domain
CreditBundesbedarfsplangesetz and Energieleitungsausbaugesetz: project annexes
Licence termsPublic domain: statutes are not protected by copyright in Germany (§ 5 Abs. 1 UrhG: "Gesetze, Verordnungen, amtliche Erlasse und Bekanntmachungen ... genießen keinen urheberrechtlichen Schutz"). gesetze-im-internet.de (Bundesministerium der Justiz) offers the XML for automated processing (Hinweise, section 6 "Download und Weiterverwertung der Normen"). Checked 2026-10-24 at https://www.gesetze-im-internet.de/hinweise.html
CoverageGermany
AccessXML of each act (https://www.gesetze-im-internet.de/bbplg/xml.zip, https://www.gesetze-im-internet.de/enlag/xml.zip), the annex table
RefreshMonthly

Download

Public claims as JSON Lines, one record per line. Listed claims carry no value. Every source's public claims together, as CSV, are in the open data download.

FileRecordsUpdatedLast checked
grid_projects.jsonl68824 Oct 202624 Oct 2026

Pages built from this source

Transmission lines

An extract from Bundesbedarfsplangesetz and Energieleitungsausbaugesetz: project annexes.Its records for a place or owner you name, joined to the owners and grid data from our other sources: on request.

Request an extract

Data on this page