Powered land · Thuringia

66 ha site at Gemarkung Stadtlengsfeld, Flurstück 1936

A candidate site of 66.2 ha in Thuringia, made up of 1 cadastral parcel, mostly forest. It lies 1 km from the substation 110 kV substation Martinroda (Thüringer Energienetze). The nearest transmission substation, Umspannwerk Mecklar 380kV (380 kV), is 27.1 km away.

Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.

Request owner, grid and planning

Facts

Every value links to its source. Licences and last-checked dates are per row.

FactValueSource
Area66.2 ha (the official areas of its parcels added up)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Cadastral parcels1 (largest: Gemarkung Stadtlengsfeld, Flurstück 1936)ALKIS Thüringen (open cadastre) · CC BY 4.0 · checked 24 Oct 2026
Land useForest (Wald) (97% of the area, as the cadastre records it)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
LocationThuringiaRare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Coordinates50.7996, 10.0848 (a point on the largest parcel)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Nearest substation110 kV substation Martinroda (1 km, site edge to substation fence)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Substation voltage110 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Substation operatorThüringer EnergienetzeOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Nearest transmission substationUmspannwerk Mecklar 380kV (27.1 km from the nearest parcel, 380 kV, TenneT TSO GmbH)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026

How it compares

#103 of 200 sites in Thuringia and #2,666 of 4,863 in Germany by site score. Larger than 46% of the sites in Thuringia. Closer to its substation than 64% of them.

PartThis sitePointsOf
Area66.2 ha21.435
Distance to the substation1 km17.535
Substation voltage110 kV1030
Site score49100

How the site score works in Germany · Search sites in Thuringia

Nearby sites on the same substation

2 other sites have 110 kV substation Martinroda as nearest substation and would compete for its capacity.

Data on this page