Powered land · Thuringia
112 ha site at Gemarkung Luckaer Forst, Flurstück 3/27
A candidate site of 112 ha in Thuringia, made up of 1 cadastral parcel, mostly forest. It lies 1.19 km from the 110 kV substation Umspannwerk Meuselwitz (Mitnetz Strom). The nearest transmission substation, Umspannwerk Pulgar (380 kV), is 12.8 km away, where the grid development plan lists 1 measure.
Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.
Request owner, grid and planningFacts
Every value links to its source. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Area | 112 ha (the official areas of its parcels added up) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Cadastral parcels | 1 (largest: Gemarkung Luckaer Forst, Flurstück 3/27) | ALKIS Thüringen (open cadastre) · CC BY 4.0 · checked 24 Oct 2026 |
| Land use | Forest (Wald) (98% of the area, as the cadastre records it) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Location | Thuringia | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 51.0804, 12.3421 (a point on the largest parcel) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Nearest substation | Umspannwerk Meuselwitz (1.19 km, site edge to substation fence) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Substation voltage | 110 kV | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Substation operator | Mitnetz Strom | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Nearest transmission substation | Umspannwerk Pulgar (12.8 km from the nearest parcel, 380 kV, 50Hertz Transmission GmbH) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Planned at that substation | 380 kV AC switchgear (replacement) (due 2045) (Netzentwicklungsplan) | Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026 |
How it compares
#42 of 200 sites in Thuringia and #1,236 of 4,863 in Germany by site score. Larger than 82% of the sites in Thuringia. Closer to its substation than 57% of them.
| Part | This site | Points | Of |
|---|---|---|---|
| Area | 112 ha | 35 | 35 |
| Distance to the substation | 1.19 km | 14.2 | 35 |
| Substation voltage | 110 kV | 10 | 30 |
| Site score | 59 | 100 |
How the site score works in Germany · Search sites in Thuringia
Nearby sites on the same substation
6 other sites have Umspannwerk Meuselwitz as nearest substation and would compete for its capacity.
- 114 ha site at Gemarkung Luckaer Forst, Flurstück 3/211.19 km · score 59
- 50 ha site at Gemarkung Falkenhain, Flurstück 292/100.21 km · score 57
- 92 ha site at Gemarkung Luckaer Forst, Flurstück 3/221.31 km · score 52
- 53 ha site at Gemarkung Schnauderhainichen, Flurstück 308/70.63 km · score 51
- 83 ha site at Gemarkung Falkenhain, Flurstück 6061.39 km · score 48
- 53 ha site at Gemarkung Prößdorf, Flurstück 871.85 km · score 30
- Sites in Thuringia205
- Sites in Germany5,000
- Umspannwerk Meuselwitzsubstation
Data on this page
- © GDI-Th. ALKIS Thüringen (open cadastre), CC BY 4.0.
- Netzentwicklungsplan Strom 2037/2045 (2025), zweiter Entwurf | Übertragungsnetzbetreiber (M) CC-BY-4.0. Netzentwicklungsplan Strom: digital project library, CC BY 4.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- Rare Context. Rare Context powered-land sites, ODbL 1.0.