Powered land · Thuringia
62 ha site at Gemarkung Frössen, Flurstück 219/16
A candidate site of 62.2 ha in Thuringia, made up of 1 cadastral parcel, mostly forest. It lies 1.83 km from an unnamed 110 kV substation. The nearest transmission substation, Umspannwerk Remptendorf (380 kV), is 11 km away, where the grid development plan lists 3 measures.
Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.
Request owner, grid and planningFacts
Every value links to its source. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Area | 62.2 ha (the official areas of its parcels added up) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Cadastral parcels | 1 (largest: Gemarkung Frössen, Flurstück 219/16) | ALKIS Thüringen (open cadastre) · CC BY 4.0 · checked 24 Oct 2026 |
| Land use | Forest (Wald) (97% of the area, as the cadastre records it) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Location | Thuringia | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 50.4506, 11.7317 (a point on the largest parcel) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Nearest substation | 110 kV substation (OSM way/137247100) (1.83 km, site edge to substation fence) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Substation voltage | 110 kV | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Nearest transmission substation | Umspannwerk Remptendorf (11 km from the nearest parcel, 380 kV, 50Hertz Transmission GmbH) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Planned at that substation | 380 kV shunt reactor (2x 176 Mvar) (due 2030); 380 kV AC switchgear (replacement) (due 2045) (Netzentwicklungsplan; 1 more measure available on request) | Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026 |
How it compares
#184 of 200 sites in Thuringia and #4,505 of 4,863 in Germany by site score. Larger than 39% of the sites in Thuringia. Closer to its substation than 12% of them.
| Part | This site | Points | Of |
|---|---|---|---|
| Area | 62.2 ha | 20 | 35 |
| Distance to the substation | 1.83 km | 3 | 35 |
| Substation voltage | 110 kV | 10 | 30 |
| Site score | 33 | 100 |
How the site score works in Germany · Search sites in Thuringia
- Sites in Thuringia205
- Sites in Germany5,000
- Unnamed 110 kV substationsubstation
Data on this page
- © GDI-Th. ALKIS Thüringen (open cadastre), CC BY 4.0.
- Netzentwicklungsplan Strom: point measures (Punktmaßnahmen). Netzentwicklungsplan Strom: point measures (Punktmaßnahmen), Restricted.
- Netzentwicklungsplan Strom 2037/2045 (2025), zweiter Entwurf | Übertragungsnetzbetreiber (M) CC-BY-4.0. Netzentwicklungsplan Strom: digital project library, CC BY 4.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- Rare Context. Rare Context powered-land sites, ODbL 1.0.