Powered land · Saxony
59 ha site at Gemarkung Zeithain, Flurstück 1067/4
A candidate site of 58.8 ha in Saxony, made up of 1 cadastral parcel, mostly sport and leisure land. It lies 1.47 km from the 110 kV substation Umspannwerk Zeithain-Ehrenhain. The nearest transmission substation, Umspannwerk Streumen (380 kV), is 3.4 km away, where the grid development plan lists 3 measures.
Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.
Request owner, grid and planningFacts
Every value links to its source. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Area | 58.8 ha (the official areas of its parcels added up) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Cadastral parcels | 1 (largest: Gemarkung Zeithain, Flurstück 1067/4) | ALKIS Sachsen (open cadastre) · Free of charge with the source credited · checked 24 Oct 2026 |
| Land use | Sport and leisure land (Sport-, Freizeit- und Erholungsfläche) (100% of the area, as the cadastre records it) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Location | Saxony | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 51.3585, 13.3319 (a point on the largest parcel) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Nearest substation | Umspannwerk Zeithain-Ehrenhain (1.47 km, site edge to substation fence) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Substation voltage | 110 kV | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Nearest transmission substation | Umspannwerk Streumen (3.4 km from the nearest parcel, 380 kV, 50Hertz Transmission GmbH) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Planned at that substation | STATCOM (2x) (due 2032); 380 kV AC switchgear (replacement) (due 2032) (Netzentwicklungsplan; 1 more measure available on request) | Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026 |
How it compares
#224 of 264 sites in Saxony and #4,059 of 4,863 in Germany by site score. Larger than 41% of the sites in Saxony. Closer to its substation than 30% of them.
| Part | This site | Points | Of |
|---|---|---|---|
| Area | 58.8 ha | 18.8 | 35 |
| Distance to the substation | 1.47 km | 9.3 | 35 |
| Substation voltage | 110 kV | 10 | 30 |
| Site score | 38 | 100 |
How the site score works in Germany · Search sites in Saxony
Nearby sites on the same substation
2 other sites have Umspannwerk Zeithain-Ehrenhain as nearest substation and would compete for its capacity.
- 71 ha site at Gemarkung Zeithain, Flurstück 719/231.04 km · score 50
- 50 ha site at Gemarkung Zeithain, Flurstück 1026/11.5 km · score 35
- Sites in Saxony272
- Sites in Germany5,000
- Umspannwerk Zeithain-Ehrenhainsubstation
Data on this page
- ALKIS Sachsen (open cadastre). ALKIS Sachsen (open cadastre), Free of charge with the source credited.
- Netzentwicklungsplan Strom: point measures (Punktmaßnahmen). Netzentwicklungsplan Strom: point measures (Punktmaßnahmen), Restricted.
- Netzentwicklungsplan Strom 2037/2045 (2025), zweiter Entwurf | Übertragungsnetzbetreiber (M) CC-BY-4.0. Netzentwicklungsplan Strom: digital project library, CC BY 4.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- Rare Context. Rare Context powered-land sites, ODbL 1.0.