71 ha site at Gemarkung Bluno Flur 5, Flurstück 59
A candidate site of 71.3 ha in Saxony, made up of 1 cadastral parcel, mostly forest. It lies 1.65 km from the 110 kV substation Umspannwerk Gießerei Sabrodt. The nearest transmission substation, Graustein (380 kV), is 15.9 km away, where the grid development plan lists 2 measures.
Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.
Request owner, grid and planningFacts
Every value links to its source. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Area | 71.3 ha (the official areas of its parcels added up) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Cadastral parcels | 1 (largest: Gemarkung Bluno Flur 5, Flurstück 59) | ALKIS Sachsen (open cadastre) · Free of charge with the source credited · checked 24 Oct 2026 |
| Land use | Forest (Wald) (99% of the area, as the cadastre records it) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Location | Saxony | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 51.5085, 14.2507 (a point on the largest parcel) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Nearest substation | Umspannwerk Gießerei Sabrodt (1.65 km, site edge to substation fence) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Substation voltage | 110 kV | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Nearest transmission substation | Graustein (15.9 km from the nearest parcel, 380 kV, 50Hertz Transmission GmbH) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Planned at that substation | 380 kV shunt reactor (1x 176 Mvar) (due 2037) (Netzentwicklungsplan; 1 more measure available on request) | Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026 |
How it compares
#219 of 264 sites in Saxony and #3,923 of 4,863 in Germany by site score. Larger than 59% of the sites in Saxony. Closer to its substation than 19% of them.
| Part | This site | Points | Of |
|---|---|---|---|
| Area | 71.3 ha | 23.2 | 35 |
| Distance to the substation | 1.65 km | 6.1 | 35 |
| Substation voltage | 110 kV | 10 | 30 |
| Site score | 39 | 100 |
How the site score works in Germany · Search sites in Saxony
Nearby sites on the same substation
3 other sites have Umspannwerk Gießerei Sabrodt as nearest substation and would compete for its capacity.
- 271 ha site at Gemarkung Bluno Flur 5, Flurstück 30/80.81 km · score 66
- 125 ha site at Gemarkung Seidewinkel Flur 9, Flurstück 71/11.86 km · score 47
- 60 ha site at Gemarkung Seidewinkel Flur 9, Flurstück 651.6 km · score 36
- Sites in Saxony272
- Sites in Germany5,000
- Umspannwerk Gießerei Sabrodtsubstation
Data on this page
- ALKIS Sachsen (open cadastre). ALKIS Sachsen (open cadastre), Free of charge with the source credited.
- Netzentwicklungsplan Strom: point measures (Punktmaßnahmen). Netzentwicklungsplan Strom: point measures (Punktmaßnahmen), Restricted.
- Netzentwicklungsplan Strom 2037/2045 (2025), zweiter Entwurf | Übertragungsnetzbetreiber (M) CC-BY-4.0. Netzentwicklungsplan Strom: digital project library, CC BY 4.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- Rare Context. Rare Context powered-land sites, ODbL 1.0.