Powered land · Saxony-Anhalt

87 ha site at Gemarkung Möckern, Flur 13, Flurstück 10019

A candidate site of 86.6 ha in Saxony-Anhalt, made up of 1 cadastral parcel, mostly forest. It lies 1.39 km from the 110 kV substation Möckern (Avacon Netz GmbH). The nearest transmission substation, Umspannwerk Wolmirstedt (380 kV), is 24.7 km away, where the grid development plan lists 2 measures.

Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.

Request owner, grid and planning

Facts

Every value links to its source. Licences and last-checked dates are per row.

FactValueSource
Area86.6 ha (the official areas of its parcels added up)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Cadastral parcels1 (largest: Gemarkung Möckern, Flur 13, Flurstück 10019)ALKIS Sachsen-Anhalt (open cadastre) · dl-de/by-2-0 for LVermGeo open data · checked 24 Oct 2026
Land useForest (Wald) (95% of the area, as the cadastre records it)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
LocationSaxony-AnhaltRare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Coordinates52.1646, 11.9651 (a point on the largest parcel)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Nearest substationMöckern (1.39 km, site edge to substation fence)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Substation voltage110 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Substation operatorAvacon Netz GmbHOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Nearest transmission substationUmspannwerk Wolmirstedt (24.7 km from the nearest parcel, 380 kV, 50Hertz Transmission GmbH)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Planned at that substation380 kV AC switchgear (replacement) (due 2034) (Netzentwicklungsplan; 1 more measure available on request)Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026

How it compares

#127 of 256 sites in Saxony-Anhalt and #2,631 of 4,863 in Germany by site score. Larger than 70% of the sites in Saxony-Anhalt. Closer to its substation than 38% of them.

PartThis sitePointsOf
Area86.6 ha28.535
Distance to the substation1.39 km10.735
Substation voltage110 kV1030
Site score49100

How the site score works in Germany · Search sites in Saxony-Anhalt