Powered land · Saxony-Anhalt
54 ha site at Gemarkung Magdeburg, Flur 713, Flurstück 10017
A candidate site of 54.3 ha in Saxony-Anhalt, made up of 1 cadastral parcel, mostly woodland. It lies 1.89 km from the 110 kV substation Magdeburg/Rothensee (Netze Magdeburg). The nearest transmission substation, Umspannwerk Wolmirstedt (380 kV), is 11.9 km away, where the grid development plan lists 2 measures.
Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.
Request owner, grid and planningFacts
Every value links to its source. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Area | 54.3 ha (the official areas of its parcels added up) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Cadastral parcels | 1 (largest: Gemarkung Magdeburg, Flur 713, Flurstück 10017) | ALKIS Sachsen-Anhalt (open cadastre) · dl-de/by-2-0 for LVermGeo open data · checked 24 Oct 2026 |
| Land use | Woodland (Gehölz) (52% of the area, as the cadastre records it) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Location | Saxony-Anhalt | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 52.1634, 11.6882 (a point on the largest parcel) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Nearest substation | Magdeburg/Rothensee (1.89 km, site edge to substation fence) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Substation voltage | 110 kV | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Substation operator | Netze Magdeburg | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Nearest transmission substation | Umspannwerk Wolmirstedt (11.9 km from the nearest parcel, 380 kV, 50Hertz Transmission GmbH) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Planned at that substation | 380 kV AC switchgear (replacement) (due 2034) (Netzentwicklungsplan; 1 more measure available on request) | Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026 |
How it compares
#252 of 256 sites in Saxony-Anhalt and #4,774 of 4,863 in Germany by site score. Larger than 31% of the sites in Saxony-Anhalt. Closer to its substation than 5% of them.
| Part | This site | Points | Of |
|---|---|---|---|
| Area | 54.3 ha | 17.2 | 35 |
| Distance to the substation | 1.89 km | 1.9 | 35 |
| Substation voltage | 110 kV | 10 | 30 |
| Site score | 29 | 100 |
How the site score works in Germany · Search sites in Saxony-Anhalt
Nearby sites on the same substation
1 other site has Magdeburg/Rothensee as nearest substation and would compete for its capacity.
- 132 ha site at Gemarkung Magdeburg, Flur 712, Flurstück 6/171.31 km · score 57
- Sites in Saxony-Anhalt265
- Sites in Germany5,000
- Magdeburg/Rothenseesubstation
Data on this page
- © GeoBasis-DE/LVermGeo ST. ALKIS Sachsen-Anhalt (open cadastre), dl-de/by-2-0 for LVermGeo open data.
- Netzentwicklungsplan Strom: point measures (Punktmaßnahmen). Netzentwicklungsplan Strom: point measures (Punktmaßnahmen), Restricted.
- Netzentwicklungsplan Strom 2037/2045 (2025), zweiter Entwurf | Übertragungsnetzbetreiber (M) CC-BY-4.0. Netzentwicklungsplan Strom: digital project library, CC BY 4.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- Rare Context. Rare Context powered-land sites, ODbL 1.0.