Powered land · Saxony-Anhalt

91 ha site at Gemarkung Lochau, Flur 2, Flurstück 2/8

A candidate site of 91.4 ha in Saxony-Anhalt, made up of 1 cadastral parcel, mostly woodland. It lies 1.22 km from the 110 kV substation Umspannwerk Döllnitz (Mitnetz Strom). The nearest transmission substation, Umspannwerk Lauchstädt (380 kV), is 11.9 km away, where the grid development plan lists 5 measures.

Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.

Request owner, grid and planning

Facts

Every value links to its source. Licences and last-checked dates are per row.

FactValueSource
Area91.4 ha (the official areas of its parcels added up)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Cadastral parcels1 (largest: Gemarkung Lochau, Flur 2, Flurstück 2/8)ALKIS Sachsen-Anhalt (open cadastre) · dl-de/by-2-0 for LVermGeo open data · checked 24 Oct 2026
Land useWoodland (Gehölz) (65% of the area, as the cadastre records it)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
LocationSaxony-AnhaltRare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Coordinates51.4158, 12.0699 (a point on the largest parcel)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Nearest substationUmspannwerk Döllnitz (1.22 km, site edge to substation fence)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Substation voltage110 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Substation operatorMitnetz StromOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Nearest transmission substationUmspannwerk Lauchstädt (11.9 km from the nearest parcel, 380 kV, 50Hertz Transmission GmbH)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Planned at that substation380/220 kV grid coupling transformer (2x) (due 2026); STATCOM (2x) (due 2026-2030); MSCDN (2x) (due 2026-2030) (Netzentwicklungsplan; 2 more measures available on request)Netzentwicklungsplan Strom: digital project library · record · CC BY 4.0 · checked 24 Oct 2026

How it compares

#75 of 256 sites in Saxony-Anhalt and #1,913 of 4,863 in Germany by site score. Larger than 74% of the sites in Saxony-Anhalt. Closer to its substation than 49% of them.

PartThis sitePointsOf
Area91.4 ha30.235
Distance to the substation1.22 km13.735
Substation voltage110 kV1030
Site score54100

How the site score works in Germany · Search sites in Saxony-Anhalt

Nearby sites on the same substation

1 other site has Umspannwerk Döllnitz as nearest substation and would compete for its capacity.