Powered land · Mecklenburg-Vorpommern
54 ha site at Gemarkung Peenemünde, Flur 7, Flurstück 5
A candidate site of 54.3 ha in Mecklenburg-Vorpommern, made up of 1 cadastral parcel, mostly forest. It lies 1.95 km from the 110 kV substation Karlshagen (E.DIS Netz GmbH). The nearest transmission substation, Umspannwerk Lubmin (380 kV), is 7.6 km away, where the grid development plan lists 3 measures.
Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.
Request owner, grid and planningFacts
Every value links to its source. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Area | 54.3 ha (the official areas of its parcels added up) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Cadastral parcels | 1 (largest: Gemarkung Peenemünde, Flur 7, Flurstück 5) | ALKIS Mecklenburg-Vorpommern (open cadastre) · Free reuse with credit · checked 24 Oct 2026 |
| Land use | Forest (Wald) (100% of the area, as the cadastre records it) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Location | Mecklenburg-Vorpommern | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 54.1299, 13.8051 (a point on the largest parcel) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Nearest substation | Karlshagen (1.95 km, site edge to substation fence) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Substation voltage | 110 kV | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Substation operator | E.DIS Netz GmbH | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Nearest transmission substation | Umspannwerk Lubmin (7.6 km from the nearest parcel, 380 kV, 50Hertz Transmission GmbH) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Planned at that substation | 380 kV shunt reactor (1x 176 Mvar) (due 2027-2030) (Netzentwicklungsplan; 2 more measures available on request) | Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026 |
How it compares
#241 of 247 sites in Mecklenburg-Vorpommern and #4,807 of 4,863 in Germany by site score. Larger than 34% of the sites in Mecklenburg-Vorpommern. Closer to its substation than 2% of them.
| Part | This site | Points | Of |
|---|---|---|---|
| Area | 54.3 ha | 17.3 | 35 |
| Distance to the substation | 1.95 km | 0.9 | 35 |
| Substation voltage | 110 kV | 10 | 30 |
| Site score | 28 | 100 |
How the site score works in Germany · Search sites in Mecklenburg-Vorpommern
Nearby sites on the same substation
3 other sites have Karlshagen as nearest substation and would compete for its capacity.
- 143 ha site at Gemarkung Peenemünde, Flur 7, Flurstück 7/140.02 km · score 80
- 225 ha site at Gemarkung Peenemünde, Flur 7, Flurstück 7/480.25 km · score 76
- 57 ha site at Gemarkung Karlshagen, Flur 3, Flurstück 31/4651.75 km · score 33
- Sites in Mecklenburg-Vorpommern258
- Sites in Germany5,000
- Karlshagensubstation
Data on this page
- © GeoBasis-DE/M-V 2026. ALKIS Mecklenburg-Vorpommern (open cadastre), Free reuse with credit.
- Netzentwicklungsplan Strom: point measures (Punktmaßnahmen). Netzentwicklungsplan Strom: point measures (Punktmaßnahmen), Restricted.
- Netzentwicklungsplan Strom 2037/2045 (2025), zweiter Entwurf | Übertragungsnetzbetreiber (M) CC-BY-4.0. Netzentwicklungsplan Strom: digital project library, CC BY 4.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- Rare Context. Rare Context powered-land sites, ODbL 1.0.