Powered land · Lower Saxony

67 ha site at Gemarkung Büren, Flur 5, Flurstück 1/3

A candidate site of 67.2 ha in Lower Saxony, made up of 1 cadastral parcel. It lies 0.56 km from the 110 kV substation Büren (Avacon Netz GmbH). The nearest transmission substation, Landesbergen (380 kV), is 23.8 km away, where the grid development plan lists 4 measures.

Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.

Request owner, grid and planning

Facts

Every value links to its source. Licences and last-checked dates are per row.

FactValueSource
Area67.2 ha (the official areas of its parcels added up)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Cadastral parcels1 (largest: Gemarkung Büren, Flur 5, Flurstück 1/3)ALKIS Niedersachsen (open cadastre) · CC BY 4.0 for LGLN OpenGeoData since 2024-06-09 · checked 24 Oct 2026
LocationLower SaxonyRare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Coordinates52.5961, 9.4671 (a point on the largest parcel)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Nearest substationBüren (0.56 km, site edge to substation fence)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Substation voltage110 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Substation operatorAvacon Netz GmbHOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Nearest transmission substationLandesbergen (23.8 km from the nearest parcel, 380 kV, TenneT TSO GmbH)Rare Context powered-land sites · ODbL 1.0 · checked 25 Oct 2026
Planned at that substation380 kV shunt reactor (1x) (due 2026); Short-circuit strength upgrade (due 2037) (Netzentwicklungsplan; 2 more measures available on request)Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
Large generation within 10 km63 MW of wind (1 plant of 50 MW or more in operation)Rare Context powered-land sites · ODbL 1.0 · checked 25 Oct 2026
Water stressMedium to high (20–40%) (score 2.9 of 5, withdrawals 36% of renewable supply)WRI Aqueduct 4.0 · CC BY 4.0 · checked 25 Oct 2026

How it compares

#170 of 562 sites in Lower Saxony and #1,542 of 4,863 in Germany by site score. Larger than 56% of the sites in Lower Saxony. Closer to its substation than 76% of them.

PartThis sitePointsOf
Area67.2 ha21.835
Distance to the substation0.56 km25.235
Substation voltage110 kV1030
Site score57100

How the site score works in Germany · Search sites in Lower Saxony