Powered land · Brandenburg
431 ha site at Gemarkung Sedlitz, Flur 4, Flurstück 90
A candidate site of 431 ha in Brandenburg, made up of 1 cadastral parcel. It lies 1.75 km from an unnamed 110 kV substation (Mitnetz Strom). The nearest transmission substation, Umspannwerk Altdöbern (380 kV), is 14.1 km away, where the grid development plan lists 3 measures.
Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.
Request owner, grid and planningFacts
Every value links to its source. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Area | 431 ha (the official areas of its parcels added up) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Cadastral parcels | 1 (largest: Gemarkung Sedlitz, Flur 4, Flurstück 90) | ALKIS Brandenburg (open cadastre) · dl-de/by-2-0 · checked 24 Oct 2026 |
| Location | Brandenburg | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 51.5333, 14.1144 (a point on the largest parcel) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Nearest substation | 110 kV substation (OSM way/98182881) (1.75 km, site edge to substation fence) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Substation voltage | 110 kV | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Substation operator | Mitnetz Strom | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Nearest transmission substation | Umspannwerk Altdöbern (14.1 km from the nearest parcel, 380 kV, 50Hertz Transmission GmbH) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Planned at that substation | 380 kV shunt reactor (1x 176 Mvar) (due 2030) (Netzentwicklungsplan; 2 more measures available on request) | Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026 |
How it compares
#283 of 547 sites in Brandenburg and #2,584 of 4,863 in Germany by site score. Larger than 99% of the sites in Brandenburg. Closer to its substation than 15% of them.
| Part | This site | Points | Of |
|---|---|---|---|
| Area | 431 ha | 35 | 35 |
| Distance to the substation | 1.75 km | 4.4 | 35 |
| Substation voltage | 110 kV | 10 | 30 |
| Site score | 49 | 100 |
How the site score works in Germany · Search sites in Brandenburg
Nearby sites on the same substation
3 other sites have this substation as nearest substation and would compete for its capacity.
- 136 ha site at Gemarkung Lieske, Flur 3, Flurstück 2550.18 km · score 77
- 62 ha site at Gemarkung Lieske, Flur 3, Flurstück 157/70.87 km · score 50
- 56 ha site at Gemarkung Lieske, Flur 1, Flurstück 1410.94 km · score 46
- Sites in Brandenburg567
- Sites in Germany5,000
- Unnamed 110 kV substationsubstation
Data on this page
- © GeoBasis-DE/LGB, dl-de/by-2-0 (Daten geändert). ALKIS Brandenburg (open cadastre), dl-de/by-2-0.
- Netzentwicklungsplan Strom: point measures (Punktmaßnahmen). Netzentwicklungsplan Strom: point measures (Punktmaßnahmen), Restricted.
- Netzentwicklungsplan Strom 2037/2045 (2025), zweiter Entwurf | Übertragungsnetzbetreiber (M) CC-BY-4.0. Netzentwicklungsplan Strom: digital project library, CC BY 4.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- Rare Context. Rare Context powered-land sites, ODbL 1.0.