Powered land · Brandenburg
403 ha site at Gemarkung Dissenchen, Flur 14, Flurstück 34
A candidate site of 403 ha in Brandenburg, made up of 1 cadastral parcel. It touches the 110 kV substation UW (LEAG): most such sites are the station's own land. The nearest transmission substation, Umspannwerk Preilack (380 kV), is 10.6 km away, where the grid development plan lists 4 measures.
Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.
Request owner, grid and planningFacts
Every value links to its source. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Area | 403 ha (the official areas of its parcels added up) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Cadastral parcels | 1 (largest: Gemarkung Dissenchen, Flur 14, Flurstück 34) | ALKIS Brandenburg (open cadastre) · dl-de/by-2-0 · checked 24 Oct 2026 |
| Location | Brandenburg | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 51.7913, 14.4365 (a point on the largest parcel) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Nearest substation | UW (0 km, site edge to substation fence) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Substation voltage | 110 kV | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Substation operator | LEAG | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Nearest transmission substation | Umspannwerk Preilack (10.6 km from the nearest parcel, 380 kV, 50Hertz Transmission GmbH) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Planned at that substation | 380 kV shunt reactor (1x 176 Mvar) (due 2035); 380 kV AC switchgear (replacement) (due 2035); STATCOM (1x) (due 2035) (Netzentwicklungsplan; 1 more measure available on request) | Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026 |
How it compares
Ranked apart: it touches its substation, and most sites that do are the station's own land. Its score would be 80.
| Part | This site | Points | Of |
|---|---|---|---|
| Area | 403 ha | 35 | 35 |
| Distance to the substation | 0 km | 35 | 35 |
| Substation voltage | 110 kV | 10 | 30 |
| Site score | 80 | 100 |
How the site score works in Germany · Search sites in Brandenburg
Nearby sites on the same substation
3 other sites have UW as nearest substation and would compete for its capacity.
- 132 ha site at Gemarkung Dissenchen, Flur 14, Flurstück 520.15 km · score 77
- 318 ha site at Gemarkung Dissenchen, Flur 14, Flurstück 530.77 km · score 67
- 77 ha site at Gemarkung Dissenchen, Flur 21, Flurstück 10.93 km · score 54
- Sites in Brandenburg567
- Sites in Germany5,000
- UWsubstation
Data on this page
- © GeoBasis-DE/LGB, dl-de/by-2-0 (Daten geändert). ALKIS Brandenburg (open cadastre), dl-de/by-2-0.
- Netzentwicklungsplan Strom: point measures (Punktmaßnahmen). Netzentwicklungsplan Strom: point measures (Punktmaßnahmen), Restricted.
- Netzentwicklungsplan Strom 2037/2045 (2025), zweiter Entwurf | Übertragungsnetzbetreiber (M) CC-BY-4.0. Netzentwicklungsplan Strom: digital project library, CC BY 4.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- Rare Context. Rare Context powered-land sites, ODbL 1.0.