Powered land · Brandenburg
91 ha site at Gemarkung Bärenbrück, Flur 4, Flurstück 68/14
A candidate site of 90.6 ha in Brandenburg, made up of 1 cadastral parcel. It lies 0.86 km from the 110 kV substation Cottbus/Halde (envia). The nearest transmission substation, Umspannwerk Preilack (380 kV), is 9.4 km away, where the grid development plan lists 4 measures.
Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.
Request owner, grid and planningFacts
Every value links to its source. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Area | 90.6 ha (the official areas of its parcels added up) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Cadastral parcels | 1 (largest: Gemarkung Bärenbrück, Flur 4, Flurstück 68/14) | ALKIS Brandenburg (open cadastre) · dl-de/by-2-0 · checked 24 Oct 2026 |
| Location | Brandenburg | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 51.8046, 14.4627 (a point on the largest parcel) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Nearest substation | Cottbus/Halde (0.86 km, site edge to substation fence) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Substation voltage | 110 kV | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Substation operator | envia | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Nearest transmission substation | Umspannwerk Preilack (9.4 km from the nearest parcel, 380 kV, 50Hertz Transmission GmbH) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Planned at that substation | 380 kV shunt reactor (1x 176 Mvar) (due 2035); 380 kV AC switchgear (replacement) (due 2035); STATCOM (1x) (due 2035) (Netzentwicklungsplan; 1 more measure available on request) | Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026 |
How it compares
#112 of 547 sites in Brandenburg and #1,127 of 4,863 in Germany by site score. Larger than 71% of the sites in Brandenburg. Closer to its substation than 63% of them.
| Part | This site | Points | Of |
|---|---|---|---|
| Area | 90.6 ha | 29.9 | 35 |
| Distance to the substation | 0.86 km | 20 | 35 |
| Substation voltage | 110 kV | 10 | 30 |
| Site score | 60 | 100 |
How the site score works in Germany · Search sites in Brandenburg
Nearby sites on the same substation
2 other sites have Cottbus/Halde as nearest substation and would compete for its capacity.
- 114 ha site at Gemarkung Dissenchen, Flur 15, Flurstück 170.02 km · score 80
- 165 ha site at Gemarkung Dissenchen, Flur 14, Flurstück 540.26 km · score 75
- Sites in Brandenburg567
- Sites in Germany5,000
- Cottbus/Haldesubstation
Data on this page
- © GeoBasis-DE/LGB, dl-de/by-2-0 (Daten geändert). ALKIS Brandenburg (open cadastre), dl-de/by-2-0.
- Netzentwicklungsplan Strom: point measures (Punktmaßnahmen). Netzentwicklungsplan Strom: point measures (Punktmaßnahmen), Restricted.
- Netzentwicklungsplan Strom 2037/2045 (2025), zweiter Entwurf | Übertragungsnetzbetreiber (M) CC-BY-4.0. Netzentwicklungsplan Strom: digital project library, CC BY 4.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- Rare Context. Rare Context powered-land sites, ODbL 1.0.