Powered land · Baden-Württemberg
53 ha site at Gemarkung Tauberbischofsheim, Flurstück 6723/3
A candidate site of 52.7 ha in Baden-Württemberg, made up of 1 cadastral parcel. It lies 1.84 km from an unnamed 110 kV substation. The nearest transmission substation, Umspannwerk Höpfingen (380 kV), is 13.8 km away, where the grid development plan lists 4 measures.
Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.
Request owner, grid and planningFacts
Every value links to its source. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Area | 52.7 ha (the official areas of its parcels added up) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Cadastral parcels | 1 (largest: Gemarkung Tauberbischofsheim, Flurstück 6723/3) | ALKIS Baden-Württemberg (open cadastre) · dl-de/by-2-0 · checked 24 Oct 2026 |
| Location | Baden-Württemberg | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 49.6431, 9.6230 (a point on the largest parcel) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Nearest substation | 110 kV substation (OSM way/36733383) (1.84 km, site edge to substation fence) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Substation voltage | 110 kV | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Nearest transmission substation | Umspannwerk Höpfingen (13.8 km from the nearest parcel, 380 kV, TransnetBW GmbH) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Planned at that substation | Power flow control (due 2030); E-STATCOM (due 2037); Shunt reactor (due 2037) (Netzentwicklungsplan; 1 more measure available on request) | Netzentwicklungsplan Strom: digital project library · record · CC BY 4.0 · checked 24 Oct 2026 |
How it compares
#1,024 of 1,037 sites in Baden-Württemberg and #4,777 of 4,863 in Germany by site score. Larger than 11% of the sites in Baden-Württemberg. Closer to its substation than 9% of them.
| Part | This site | Points | Of |
|---|---|---|---|
| Area | 52.7 ha | 16.7 | 35 |
| Distance to the substation | 1.84 km | 2.8 | 35 |
| Substation voltage | 110 kV | 10 | 30 |
| Site score | 29 | 100 |
How the site score works in Germany · Search sites in Baden-Württemberg
Nearby sites on the same substation
3 other sites have this substation as nearest substation and would compete for its capacity.
- 154 ha site at Gemarkung Tauberbischofsheim, Flurstück 67230.83 km · score 65
- 171 ha site at Gemarkung Tauberbischofsheim, Flurstück 74131.58 km · score 52
- 94 ha site at Gemarkung Tauberbischofsheim, Flurstück 37111.61 km · score 48
- Sites in Baden-Württemberg1,059
- Sites in Germany5,000
- Unnamed 110 kV substationsubstation
Data on this page
- LGL-BW (2026) Datenlizenz Deutschland - Namensnennung - Version 2.0, www.lgl-bw.de. ALKIS Baden-Württemberg (open cadastre), dl-de/by-2-0.
- Netzentwicklungsplan Strom: point measures (Punktmaßnahmen). Netzentwicklungsplan Strom: point measures (Punktmaßnahmen), Restricted.
- Netzentwicklungsplan Strom 2037/2045 (2025), zweiter Entwurf | Übertragungsnetzbetreiber (M) CC-BY-4.0. Netzentwicklungsplan Strom: digital project library, CC BY 4.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- Rare Context. Rare Context powered-land sites, ODbL 1.0.