Powered land · Baden-Württemberg

146 ha site at Gemarkung Säckingen, Flurstück 4017

A candidate site of 146 ha in Baden-Württemberg, made up of 1 cadastral parcel. It lies 0.02 km from an unnamed 110 kV substation. The nearest transmission substation, Netzknoten Kühmoos (380 kV), is 3.3 km away, where the grid development plan lists 3 measures.

Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.

Request owner, grid and planning

Facts

Every value links to its source. Licences and last-checked dates are per row.

FactValueSource
Area146 ha (the official areas of its parcels added up)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Cadastral parcels1 (largest: Gemarkung Säckingen, Flurstück 4017)ALKIS Baden-Württemberg (open cadastre) · dl-de/by-2-0 · checked 24 Oct 2026
LocationBaden-WürttembergRare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Coordinates47.5683, 7.9319 (a point on the largest parcel)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Nearest substation110 kV substation (OSM way/202831212) (0.02 km, site edge to substation fence)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Substation voltage110 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Nearest transmission substationNetzknoten Kühmoos (3.3 km from the nearest parcel, 380 kV, TransnetBW GmbH)Rare Context powered-land sites · ODbL 1.0 · checked 25 Oct 2026
Planned at that substationMSCDN (due 2032); Measure in the grid development plan (due 2036); E-STATCOM (due 2037) (Netzentwicklungsplan)Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
Large generation within 10 km1,271 MW of pumped storage, 471 MW of hydropower (6 plants of 50 MW or more in operation)Rare Context powered-land sites · ODbL 1.0 · checked 25 Oct 2026
Water stressLow (under 10%) (score 0.6 of 5, withdrawals 7.7% of renewable supply)WRI Aqueduct 4.0 · CC BY 4.0 · checked 25 Oct 2026

How it compares

#37 of 1,037 sites in Baden-Württemberg and #95 of 4,863 in Germany by site score. Larger than 73% of the sites in Baden-Württemberg. Closer to its substation than 97% of them.

PartThis sitePointsOf
Area146 ha3535
Distance to the substation0.02 km34.735
Substation voltage110 kV1030
Site score80100

How the site score works in Germany · Search sites in Baden-Württemberg

Data on this page