Renewable fuel plant · Amsterdam, North Holland, Netherlands
Green gas Amsterdam (AGV Groengas)
Green gas Amsterdam (AGV Groengas) is a renewable fuel plant in Amsterdam, North Holland, Netherlands, with 13.2 MW of capacity, operated by AGV Groengas B.V.
We hold more on this renewable fuel plant.Grid operator: available on request.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Amsterdam | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
| Grid area | Available on request | Netbeheer Nederland capaciteitskaart · Restricted · checked 25 Oct 2026 |
| Address | Australiehavenweg 108, 1046 BS Amsterdam | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
| Status | Operating | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
| Start year | 2021 | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
| Operator | AGV Groengas B.V. | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
| Capacity | 13.2 MW | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
| Technology | Green gas | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
| Grid operator | Available on request | Netbeheer Nederland capaciteitskaart · Restricted · checked 25 Oct 2026 |
| Coordinates | 52.3994, 4.7867 | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
Know more about this renewable fuel plant, or want an introduction to its operator? Ask us.
How it compares
Green gas Amsterdam (AGV Groengas) is the 3rd-largest of 8 renewable fuel plants in North Holland and the 13th-largest of 56 in the Netherlands by capacity; its 13.2 MW is 2.3% of the 584 MW we hold for the Netherlands. Ranks and totals cover the renewable fuel plants in our data that report their capacity, not every one in existence. Renewable fuel plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| North Holland | 3rd of 8 | 75 MW | 18% |
| Netherlands | 13th of 56 | 584 MW | 2.3% |
Nearby
Within 50 km of this renewable fuel plant: 599 permit notices, 399 power plants (315 operating, 4,837 MW), 97 substations, 90 data centers, 47 heat plants (25 operating, 535 MW), 5 CO2 emitters (7,018,691 tCO2e) and 2 AI supercomputers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| AGV-HVC Windpark | Power plant | 9.4 MW | Operating | 0.0 km |
| Solar Amsterdam (Waterschap Amstel, Gooi en Vecht) | Power plant | 1.3 MW | Operating | 0.0 km |
| Solar Amsterdam (UI Green) | Power plant | 1.57 MW | Operating | 0.2 km |
| Biomass heat Amsterdam (Bio Energy Netherlands) | Heat plant | 5.16 MW | Operating | 0.4 km |
| Nitrogen natuurvergunning decision, Amsterdam (prb-2024-19377) | Permit notice | — | — | 0.7 km |
| Nitrogen natuurvergunning decision, Amsterdam (prb-2025-9544) | Permit notice | — | — | 0.7 km |
| Nitrogen natuurvergunning draft decision, Amsterdam (prb-2025-4849) | Permit notice | — | — | 0.7 km |
| Biomass heat Amsterdam (Argent Energy Netherlands Holding) | Heat plant | 9.55 MW | Operating | 1.4 km |
| Equinix Amsterdam AM8 | Data center | — | — | 3.6 km |
Operator and place
Other renewable fuel plants in North Holland
- Green gas Alkmaar (SCW Systems)18.6 MW
- Green gas Amsterdam (Orgaworld Nederland)18.1 MW
- Green gas Middenmeer (N.V. HVC)8.53 MW
- Green gas Alkmaar (ENGIE RGE Alkmaar)4.9 MW
- Green gas Rijsenhout (De Meerlanden Holding)4.89 MW
- Green gas Hensbroek (Green Energy Koggenland)4.4 MW
- Green gas Warmenhuizen (B4Energy)2.44 MW
- Renewable fuel Amsterdam (Advanced Methanol Amsterdam)61.4 MW · planned
Data on this page
- Netbeheer Nederland capaciteitskaart. Netbeheer Nederland capaciteitskaart, Restricted.
- Officiële Bekendmakingen. Officiële Bekendmakingen, CC0 1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.