Green gas Son en Breugel (Ecoson) is a renewable fuel plant in Son en Breugel, North Brabant, Netherlands, with 33.3 MW of capacity, operated by Ecoson B.V.
We hold more on this renewable fuel plant.Grid operator: available on request.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Son en Breugel | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
| Grid area | Available on request | Netbeheer Nederland capaciteitskaart · Restricted · checked 25 Oct 2026 |
| Address | Kanaaldijk-Noord 20, 5691 NM Son en Breugel | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
| Status | Operating | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
| Start year | 2013 | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
| Operator | Ecoson B.V. | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
| Capacity | 33.3 MW | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
| Technology | Green gas | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
| Grid operator | Available on request | Netbeheer Nederland capaciteitskaart · Restricted · checked 25 Oct 2026 |
| Coordinates | 51.5105, 5.4515 | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
Know more about this renewable fuel plant, or want an introduction to its operator? Ask us.
How it compares
Green gas Son en Breugel (Ecoson) is the largest of 10 renewable fuel plants in North Brabant and the 3rd-largest of 56 in the Netherlands by capacity; its 33.3 MW is 5.7% of the 584 MW we hold for the Netherlands. Ranks and totals cover the renewable fuel plants in our data that report their capacity, not every one in existence. Renewable fuel plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| North Brabant | 1st of 10 | 162 MW | 21% |
| Netherlands | 3rd of 56 | 584 MW | 5.7% |
Nearby
Within 50 km of this renewable fuel plant: 832 permit notices, 626 power plants (472 operating, 3,976 MW), 67 substations, 41 heat plants (28 operating, 597 MW), 6 data centers and 1 CO2 emitter (175,529 tCO2e), measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Biomass heat Son en Breugel (Ecoson) | Heat plant | 13.6 MW | Operating | 0.0 km |
| Biomass heat Son en Breugel (Rendac Son) | Heat plant | 31.9 MW | Operating | 0.0 km |
| Biomass Son en Breugel (Ecoson) | Power plant | 1.56 MW | Operating | 0.0 km |
| Biomass Son en Breugel (Ecoson) | Power plant | 14.7 MW | Operating | 0.0 km |
| Solar Son en Breugel (Van Loon Retail & Foodservice) | Power plant | 1.04 MW | Operating | 0.8 km |
| 150 kV Best | Substation | — | — | 3.7 km |
| Substation omgevingsplan application, Best (gmb-2026-190377) | Permit notice | — | — | 3.7 km |
| Substation omgevingsplan decision, Best (gmb-2026-282730) | Permit notice | — | — | 3.7 km |
| Battery storage omgevingsvergunning application, Eindhoven (gmb-2026-31793) | Permit notice | — | — | 3.7 km |
Operator and place
More from Ecoson B.V.
Other renewable fuel plants in North Brabant
- Green gas Tilburg (VIDA bioenergy Tilburg)29.5 MW
- Green gas Sterksel (Blue Sphere Brabant)29.3 MW
- Green gas Wanroij (Aben Recycling)21.2 MW
- Green gas Wilbertoord (B.V. Landgoed De Princepeel)14.3 MW
- Green gas Dinteloord (Centraal Kantoor Suiker Unie)12.2 MW
- Green gas Waalwijk (Wabico)9.23 MW
- Green gas Tilburg (Attero)7.32 MW
- Green gas Odiliapeel (Rem-Tm)6.72 MW
Data on this page
- Netbeheer Nederland capaciteitskaart. Netbeheer Nederland capaciteitskaart, Restricted.
- Officiële Bekendmakingen. Officiële Bekendmakingen, CC0 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.