Renewable fuel plant · Maashorst, North Brabant, Netherlands
Green gas Odiliapeel (Rem-Tm)
Green gas Odiliapeel (Rem-Tm) is a permitted renewable fuel plant in Maashorst, North Brabant, Netherlands, with 3.13 MW of capacity, operated by Rem-Tm B.V.
We hold more on this renewable fuel plant.Grid operator: available on request.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Grid area | Available on request | Netbeheer Nederland capaciteitskaart · Restricted · checked 25 Oct 2026 |
| Location | Maashorst | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
| Address | Nieuwedijk 15, 5409 SB Odiliapeel | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
| Status | Permitted (SDE subsidy granted, not yet in use) | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
| Operator | Rem-Tm B.V. | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
| Capacity | 3.13 MW | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
| Technology | Green gas | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
| Grid operator | Available on request | Netbeheer Nederland capaciteitskaart · Restricted · checked 25 Oct 2026 |
| Coordinates | 51.6578, 5.7227 | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 25 Oct 2026 |
Know more about this renewable fuel plant, or want an introduction to its operator? Ask us.
How it compares
Green gas Odiliapeel (Rem-Tm) is the 4th-largest of 4 renewable fuel plants planned, permitted or under construction in North Brabant and the 16th-largest of 18 in the Netherlands by capacity; its 3.13 MW is 1.6% of the 197 MW of renewable fuel plants planned, permitted or under construction we hold for the Netherlands. It is not built yet, so it is ranked among the renewable fuel plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| North Brabant | 4th of 4 | 33 MW | 9.5% |
| Netherlands | 16th of 18 | 197 MW | 1.6% |
Nearby
Within 50 km of this renewable fuel plant: 1,002 permit notices, 676 power plants (499 operating, 3,146 MW), 83 substations, 40 heat plants (27 operating, 441 MW) and 11 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Biomass heat Odiliapeel (REM-TM) | Heat plant | 3.5 MW | Operating | 0.0 km |
| Biomass heat Odiliapeel (Attero) | Heat plant | 8.21 MW | Operating | 1.0 km |
| Biomass Wilbertoord (B.V. Landgoed de Princepeel) | Power plant | 13.8 MW | Operating | 1.7 km |
| Solar Wilbertoord (B.V. Landgoed De Princepeel) | Power plant | 1.49 MW | Cancelled | 1.9 km |
| Wind omgevingsvergunning decision, Land van Cuijk (gmb-2025-139368) | Permit notice | — | — | 2.5 km |
| Wind omgevingsvergunning draft decision, Land van Cuijk (gmb-2025-32011) | Permit notice | — | — | 2.5 km |
| Solar park omgevingsvergunning application, Land van Cuijk (gmb-2026-252582) | Permit notice | — | — | 3.0 km |
| Solar Uden (Gebroeders Sanders Vastgoed) | Power plant | 1.32 MW | Operating | 3.7 km |
| 150 kV Uden | Substation | — | — | 5.6 km |
Operator and place
More from Rem-Tm B.V.
Other renewable fuel plants in North Brabant
- Green gas Son en Breugel (Ecoson)33.3 MW
- Green gas Tilburg (VIDA bioenergy Tilburg)29.5 MW
- Green gas Sterksel (Blue Sphere Brabant)29.3 MW
- Green gas Wanroij (Aben Recycling)21.2 MW
- Green gas Wilbertoord (B.V. Landgoed De Princepeel)14.3 MW
- Green gas Dinteloord (Centraal Kantoor Suiker Unie)12.2 MW
- Green gas Waalwijk (Wabico)9.23 MW
- Green gas Tilburg (Attero)7.32 MW
Data on this page
- Netbeheer Nederland capaciteitskaart. Netbeheer Nederland capaciteitskaart, Restricted.
- Officiële Bekendmakingen. Officiële Bekendmakingen, CC0 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.