Enabling CRM production in Europe by recovering CRM from end-of-life batteries: A scalable battery black mass refining process that extracts critical raw materials from all types of Li-ion batteries in an environmental friendly way is a processing plant project selected as an EU strategic project in the Netherlands, owned by Back to Battery B.V.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Netherlands | EU CRMA strategic projects · CC BY 4.0 · checked 24 Oct 2026 |
| Commodities | cobalt, graphite, lithium, manganese, nickel | EU CRMA strategic projects · CC BY 4.0 · checked 24 Oct 2026 |
| Owner | Back to Battery B.V. | EU CRMA strategic projects · CC BY 4.0 · checked 24 Oct 2026 |
| CRMA stage | Recycling | EU CRMA strategic projects · CC BY 4.0 · checked 24 Oct 2026 |
| Selected as CRMA strategic project | 9 Oct 2026 (Commission decision C(2026) 8051, round 2, in the EU) | EU CRMA strategic projects · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 51.9909, 4.3707 | EU CRMA strategic projects · CC BY 4.0 · checked 24 Oct 2026 |
Research on this processing plant and its owner.Who owns it up to the parent company, its permits and status, and an introduction to the owner.
Request researchNearby
Within 50 km of this processing plant: 484 permit notices, 472 power plants (381 operating, 9,997 MW), 147 substations, 80 CO2 emitters (43 operating) and 50 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| 150 kV Delft | Substation | — | — | 0.3 km |
| 150 kV substation (OSM way/137891772) | Substation | — | — | 0.5 km |
| NorthC Datacenter Delft | Data center | — | — | 0.6 km |
| Solar Delft (Technische Universiteit Delft) | Power plant | 1 MW | Operating | 1.1 km |
| Geothermal heat Delft (Geothermie Delft) | CO2 emitter | — | Operating | 1.1 km |
| Solar Delft (Groendus Assets Holding) | Power plant | 1.29 MW | Operating | 1.4 km |
| Solar Delfgauw (Koninklijke Ahold) | Power plant | 3 MW | Operating | 1.8 km |
| 380 kV substation (OSM way/165957581) | Substation | — | — | 2.8 km |
| Battery storage omgevingsplan application, Midden-Delfland (gmb-2026-166439) | Permit notice | — | — | 3.7 km |
Owner and place
Other processing plants in Netherlands
Data on this page
- © European Union, European Commission (DG GROW). EU CRMA strategic projects, CC BY 4.0.
- Officiële Bekendmakingen. Officiële Bekendmakingen, CC0 1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.