Power plant · Texas, United States
Pintail BESS
Pintail BESS is a power plant under construction in Texas, United States, with 200 MW of capacity, owned by Lydian Energy.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Texas | EIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026 |
| Status | Under construction | EIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026 |
| Start year | 2026 | EIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026 |
| Owner | Lydian Energy | EIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026 |
| Operator | Lydian Energy | EIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026 |
| Capacity | 200 MW | EIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026 |
| Technology | Batteries | EIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026 |
| Coordinates | 28.0427, -97.4401 | EIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its owner? Ask us.
How it compares
Pintail BESS is the 160th-largest of 308 power plants planned, permitted or under construction in Texas and the 416th-largest of 835 in the United States by capacity; its 200 MW is <0.1% of the 282,375 MW of power plants planned, permitted or under construction we hold for the United States. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Texas | 160th of 308 | 99,424 MW | 0.2% |
| United States | 416th of 835 | 282,375 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 740th of 6,230 | 661,188 MW | <0.1% |
Owner, operator and place
More from Lydian Energy
- Rock N' Roll250 MW · planned
- AC Ranch II230 MW · planned
- Mendoza Trail BESS200 MW · under construction
- Yellow Viking Solar170 MW · planned
- Yellow Barn Solar160 MW · planned
- Headcamp BESS150 MW · under construction
- Faraday Energy Storage150 MW · under construction
Other power plants in Texas
- W A Parish4,008 MW
- South Texas Project2,709 MW
- Comanche Peak2,430 MW
- Martin Lake2,380 MW
- Forney Energy Center1,894 MW
- Limestone1,850 MW
- Sabine1,812 MW
- Oak Grove (TX)1,795 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.