Power plant · South Carolina, United States

Kingstree East 230 Solar Project

Kingstree East 230 Solar Project is a permitted power plant in South Carolina, United States, with 249 MW of capacity, owned by Kingstree East 230 LLC.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSouth CarolinaEIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026
StatusPermittedEIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026
Start year2029EIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026
OwnerKingstree East 230 LLCEIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026
OperatorKingstree East 230 LLCEIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026
Capacity249 MWEIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026
TechnologySolar PhotovoltaicEIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026
Coordinates33.5636, -79.4633EIA-860 / 860M / 923 · Public domain · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its owner? Ask us.

How it compares

Kingstree East 230 Solar Project is the 2nd-largest of 4 power plants planned, permitted or under construction in South Carolina and the 337th-largest of 835 in the United States by capacity; its 249 MW is <0.1% of the 282,375 MW of power plants planned, permitted or under construction we hold for the United States. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
South Carolina2nd of 4799 MW31%
United States337th of 835282,375 MW<0.1%
All power plants planned, permitted or under construction in our data378th of 3,008360,526 MW<0.1%

Owner, operator and place

Other power plants in South Carolina

All 22 power plants in South Carolina, United States

Data on this page