Power plant · Kaag en Braassem, South Holland, Netherlands
Solar Roelofarendsveen (Trio Solar 5)
Solar Roelofarendsveen (Trio Solar 5) is a planned solar power plant in Kaag en Braassem, South Holland, Netherlands, with 1.26 MW of capacity, operated by Trio Solar 5 B.V.
We hold more on this power plant.Grid operator: available on request.
Request this dataFacts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Grid area | Available on request | Netbeheer Nederland capaciteitskaart · Restricted · checked 24 Oct 2026 |
| Location | Kaag en Braassem | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Address | Sotaweg 52, 2371 GD Roelofarendsveen | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Status | Planned (SDE subsidy granted, not yet in use) | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Operator | Trio Solar 5 B.V. | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Capacity | 1.26 MW | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Technology | Rooftop solar | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
| Grid operator | Available on request | Netbeheer Nederland capaciteitskaart · Restricted · checked 24 Oct 2026 |
| Coordinates | 52.2134, 4.6281 | RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Solar Roelofarendsveen (Trio Solar 5) is the 24th-largest of 25 power plants planned, permitted or under construction in South Holland and the 221st-largest of 225 in the Netherlands by capacity; its 1.26 MW is <0.1% of the 3,053 MW of power plants planned, permitted or under construction we hold for the Netherlands. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| South Holland | 24th of 25 | 139 MW | 0.9% |
| Netherlands | 221st of 225 | 3,053 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 5,637th of 5,799 | 657,076 MW | <0.1% |
Nearby
Within 50 km of this power plant: 683 permit notices, 153 substations, 89 data centers, 87 CO2 emitters (47 operating), 2 AI supercomputers and 2 processing plants, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Grid connection omgevingsvergunning application, Kaag en Braassem (gmb-2025-183191) | Permit notice | — | — | 0.9 km |
| Battery storage omgevingsplan decision, Kaag en Braassem (gmb-2025-123830) | Permit notice | — | — | 1.3 km |
| Battery storage omgevingsvergunning application, Kaag en Braassem (gmb-2025-40042) | Permit notice | — | — | 1.3 km |
| 380 kV substation (OSM way/778594653) | Substation | — | — | 3.0 km |
| 380 kV substation (OSM way/1342641196) | Substation | — | — | 4.8 km |
| 150 kV substation (OSM way/717310918) | Substation | — | — | 5.3 km |
| Solar thermal Nieuwveen (Verdel Tussenholding) | CO2 emitter | — | Operating | 7.7 km |
| Digital Realty AMS15 | Data center | — | — | 9.2 km |
| Digital Realty AMS16 | Data center | — | — | 9.3 km |
Operator and place
More from Trio Solar 5 B.V.
- Solar Klazienaveen (Trio Solar 5)40.5 MW
- Solar Bergschenhoek (Trio Solar 5)19.2 MW
- Solar Oude-Tonge (Trio Solar 5)18.8 MW · planned
- Solar Tinte (Trio Solar 5)15 MW · planned
- Solar Huissen (Trio Solar 5)14.7 MW
- Solar Vierpolders (Trio Solar 5)10.1 MW · planned
- Solar Dongen (Trio Solar 5)10 MW
- Solar Helenaveen (Trio Solar 5)9.94 MW
Other power plants in South Holland
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Netbeheer Nederland capaciteitskaart. Netbeheer Nederland capaciteitskaart, Restricted.
- Officiële Bekendmakingen. Officiële Bekendmakingen, CC0 1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- Wikidata. Wikidata, CC0 1.0.