Power plant · Hengelo (O.), Overijssel, Netherlands

Solar Hengelo Ov (Brunink Hof)

Solar Hengelo Ov (Brunink Hof) is a power plant in Hengelo (O.), Overijssel, Netherlands, with 1.06 MW of capacity, operated by Brunink Hof B.V.

We hold more on this asset.Grid operator and location: available on request.

Request this data

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationHengelo (O.)RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Grid areaAvailable on requestNetbeheer Nederland capaciteitskaart · Restricted · checked 24 Oct 2026
AddressBruninksweg 5, 7554 RW Hengelo OvRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
StatusOperatingRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Start year2021RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
OperatorBrunink Hof B.V.RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Capacity1.06 MWRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
TechnologyRooftop solarRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Grid operatorAvailable on requestNetbeheer Nederland capaciteitskaart · Restricted · checked 24 Oct 2026
Coordinates52.2349, 6.8002RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Solar Hengelo Ov (Brunink Hof) is the 138th-largest of 145 power plants in Overijssel and the 2,072nd-largest of 2,153 in the Netherlands by capacity; its 1.06 MW is <0.1% of the 37,557 MW we hold for the Netherlands. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Overijssel138th of 1451,078 MW<0.1%
Netherlands2,072nd of 2,15337,557 MW<0.1%
All power plants in our data11,765th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 418 permit notices, 117 substations, 20 CO2 emitters (15 operating) and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Battery storage omgevingsvergunning application, Hengelo (O) (gmb-2026-85102)Permit notice——0.5 km
Battery storage omgevingsvergunning decision, Hengelo (O) (gmb-2026-142465)Permit notice——0.5 km
Solar park omgevingsplan decision, Hengelo (O) (gmb-2024-468952)Permit notice——0.7 km
110 kV AVISubstation——1.0 km
110 kV BoldershoekSubstation——1.3 km
110 kV SalincoSubstation——1.3 km
Equinix EnschedeData center——3.4 km
Biomass heat Hengelo Ov (Warmtebedrijf Hengelo)CO2 emitter—Operating6.8 km
Biomass heat Zenderen (Twence)CO2 emitter—Operating12 km

Operator and place

More from Brunink Hof B.V.

Other power plants in Overijssel

All 162 power plants in Overijssel, Netherlands

Data on this page