Power plant · Beesel, Limburg, Netherlands

Solar Beesel (Technique Solaire Nederland)

Solar Beesel (Technique Solaire Nederland) is a cancelled solar power plant in Beesel, Limburg, Netherlands, with 2.7 MW of capacity, operated by Technique Solaire Nederland B.V.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBeeselRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
StatusCancelled (withdrawn from the list of projects in management before it was realised)RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
OperatorTechnique Solaire Nederland B.V.RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Capacity2.7 MWRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
TechnologySolarRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Coordinates51.2803, 6.0459RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Solar Beesel (Technique Solaire Nederland) was cancelled before it was built: it is not ranked among the power plants that run, and its 2.7 MW is not counted in their totals.

Nearby

Within 50 km of this power plant: 716 permit notices, 164 substations, 35 CO2 emitters (22 operating) and 10 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Nitrogen natuurvergunning application, Peel en Maas (prb-2025-3580)Permit notice——2.0 km
Nitrogen natuurvergunning decision, Peel en Maas (prb-2025-19670)Permit notice——2.0 km
Nitrogen natuurvergunning draft decision, Peel en Maas (prb-2025-16035)Permit notice——2.0 km
150 kV HeldenSubstation——5.3 km
Biomass heat Neer (Pluimveebedrijf Beenders)CO2 emitter—Operating6.4 km
150 kV BelfeldSubstation——7.1 km
150 kV BuggenumSubstation——8.2 km
Biomass heat Roggel (Doehler Roggel)CO2 emitter—Operating8.5 km
Data center, Roermond (OSM way 289816687)Data center——11 km