Power plant · Almere, Flevoland, Netherlands

Solar Almere (Trio Solar 3)

Solar Almere (Trio Solar 3) is a cancelled power plant in Almere, Flevoland, Netherlands, with 1.81 MW of capacity, operated by Trio Solar 3 B.V.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationAlmereRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
StatusCancelled (withdrawn from the list of projects in management before it was realised)RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
OperatorTrio Solar 3 B.V.RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Capacity1.81 MWRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
TechnologySolarRVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026
Coordinates52.4146, 5.2746RVO SDE(+)(+) projecten in beheer and SDE viewer · Free reuse, no attribution required · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Solar Almere (Trio Solar 3) is the 99th-largest of 116 power plants in Flevoland and the 1,546th-largest of 2,153 in the Netherlands by capacity; its 1.81 MW is <0.1% of the 37,557 MW we hold for the Netherlands. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Flevoland99th of 1163,507 MW<0.1%
Netherlands1,546th of 2,15337,557 MW<0.1%
All power plants in our data10,773rd of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 920 permit notices, 96 substations, 94 data centers, 65 CO2 emitters (37 operating), 2 AI supercomputers and 1 processing plant, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
150 kV De VaartSubstation——1.4 km
Green gas Almere (Groen Gas Almere)CO2 emitter—Operating1.7 km
Industry natuurvergunning decision, Almere (prb-2026-5008)Permit notice——2.0 km
Industry natuurvergunning draft decision, Almere (prb-2025-10969)Permit notice——2.0 km
Wind omgevingsvergunning decision, Almere (gmb-2024-529909)Permit notice——4.1 km
150 kV MarkerkantSubstation——5.1 km
150 kV NorthC BlackboxSubstation——5.6 km
NorthC AlmereData center——5.6 km
Green gas Zeewolde (Knijff Agro)CO2 emitter—Operating8.2 km

Operator and place

Other power plants in Flevoland

All 129 power plants in Flevoland, Netherlands

Data on this page