Power plant · Kleinschwabhausen, Thuringia, Germany
WP Großschwabhausen
WP Großschwabhausen is a planned power plant in Kleinschwabhausen, Thuringia, Germany, with 11.1 MW of capacity, operated by Energiequelle GmbH.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Kleinschwabhausen | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Address | 99441 Kleinschwabhausen | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Status | Planned | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Onshore or offshore | Onshore | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Operator | Energiequelle GmbH | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Capacity | 11.1 MW | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Units | 2 units | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Technology | wind | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Coordinates | 50.9430, 11.4592 | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
WP Großschwabhausen is the 60th-largest of 63 power plants planned, permitted or under construction in Thuringia and the 2,029th-largest of 2,173 in Germany by capacity; its 11.1 MW is <0.1% of the 78,152 MW of power plants planned, permitted or under construction we hold for Germany. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Thuringia | 60th of 63 | 1,717 MW | 0.65% |
| Germany | 2,029th of 2,173 | 78,152 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 5,157th of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 93 substations and 2 data centers, measured from the coordinates in the facts above. The table shows the nearest 5, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Großschwabhausen | Substation | — | — | 1.6 km |
| Großschwabhausen | Substation | — | — | 1.6 km |
| 110 kV substation (OSM way/1185500022) | Substation | — | — | 6.0 km |
| Universitätsrechenzentrum | Data center | — | — | 8.7 km |
| Rechenzentrum Thüringer Netkom | Data center | — | — | 46 km |
Operator and place
More from Energiequelle GmbH
- WP Hellberge75.1 MW
- WP Feldheim XII56 MW · planned
- Windpark Barrien36 MW · planned
- WP Bilzingsleben27.8 MW · planned
- WP Ludwigsfelde Ortsteile23.6 MW · planned
- Windpark Moorhusen Rep22.2 MW · planned
- WP Pfullendorf-Malaien21.6 MW · planned
- Windpark Alttann GmbH & Co. KG21.6 MW · planned
Other power plants in Thuringia
- PSW Goldisthal PSS1,052 MW
- PSW Hohenwarte 2 PSS318 MW
- Gasturbine 3 Jena181 MW
- Kirchheilingen121 MW
- Windpark Calau GmbH & Co. KG79.8 MW
- PSW Bleiloch PSS79.8 MW
- Kirchengel67.7 MW
- SKW Hohenwarte 163.7 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.