Power plant · Rudolstadt, Thuringia, Germany
Windpark Treppendorf Erweiterung
Windpark Treppendorf Erweiterung is a planned power plant in Rudolstadt, Thuringia, Germany, with 30.6 MW of capacity, operated by Windpark Treppendorf Erweiterung GmbH & Co. KG.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Rudolstadt | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Address | 07407 Rudolstadt | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Status | Planned | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Onshore or offshore | Onshore | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Operator | Windpark Treppendorf Erweiterung GmbH & Co. KG | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Capacity | 30.6 MW | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Units | 7 units | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Technology | wind | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Grid operator | TEN Thüringer Energienetze GmbH & Co. KG | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Coordinates | 50.8252, 11.2667 | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Windpark Treppendorf Erweiterung is the 21st-largest of 63 power plants planned, permitted or under construction in Thuringia and the 550th-largest of 2,173 in Germany by capacity; its 30.6 MW is <0.1% of the 78,152 MW of power plants planned, permitted or under construction we hold for Germany. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Thuringia | 21st of 63 | 1,717 MW | 1.8% |
| Germany | 550th of 2,173 | 78,152 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 2,973rd of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 81 substations and 2 data centers, measured from the coordinates in the facts above. The table shows the nearest 5, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| 110 kV substation (OSM way/176259907) | Substation | — | — | 7.4 km |
| Stadtilm | Substation | — | — | 15 km |
| Umspannwerk Rudolstadt | Substation | — | — | 15 km |
| Universitätsrechenzentrum | Data center | — | — | 25 km |
| Rechenzentrum Thüringer Netkom | Data center | — | — | 27 km |
Operator, grid operator and place
Other power plants in Thuringia
- PSW Goldisthal PSS1,052 MW
- PSW Hohenwarte 2 PSS318 MW
- Gasturbine 3 Jena181 MW
- Kirchheilingen121 MW
- Windpark Calau GmbH & Co. KG79.8 MW
- PSW Bleiloch PSS79.8 MW
- Kirchengel67.7 MW
- SKW Hohenwarte 163.7 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.