Power plant · Massen-Niederlausitz, Brandenburg, Germany
Windpark Rehain III
Windpark Rehain III is a planned power plant in Massen-Niederlausitz, Brandenburg, Germany, with 20.4 MW of capacity, operated by UGE Rehain Zwei GmbH & Co. KG Umweltgerechte Energie.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Massen-Niederlausitz | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Address | 03238 Massen | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Status | Planned | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Onshore or offshore | Onshore | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Operator | UGE Rehain Zwei GmbH & Co. KG Umweltgerechte Energie | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Capacity | 20.4 MW | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Units | 3 units | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Technology | Wind | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Grid operator | Mitteldeutsche Netzgesellschaft Strom mbH | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
| Coordinates | 51.6554, 13.8099 | Marktstammdatenregister · record · DL-DE-BY-2.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Windpark Rehain III is the 110th-largest of 212 power plants planned, permitted or under construction in Brandenburg and the 1,058th-largest of 2,173 in Germany by capacity; its 20.4 MW is <0.1% of the 78,152 MW of power plants planned, permitted or under construction we hold for Germany. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Brandenburg | 110th of 212 | 10,106 MW | 0.2% |
| Germany | 1,058th of 2,173 | 78,152 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 3,799th of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 122 substations, measured from the coordinates in the facts above. The table shows the nearest 3.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| 110 kV substation (OSM way/743397785) | Substation | — | — | 3.5 km |
| Umspannwerk Finsterwalde | Substation | — | — | 5.8 km |
| 110 kV substation (OSM way/155775189) | Substation | — | — | 7.9 km |
Operator, grid operator and place
More from UGE Rehain Zwei GmbH & Co. KG Umweltgerechte Energie
- Windpark Rehain II40.8 MW · planned
Other power plants in Brandenburg
- Kraftwerk Jänschwalde2,000 MW
- Kraftwerk Schwarze Pumpe Block A1,595 MW
- RH Randowhöhe549 MW
- Kraftwerk Jänschwalde Block E500 MW
- Kraftwerk Jänschwalde Block F500 MW
- WP Forst-Briesnig II200 MW
- Gasturbinenkraftwerk Thyrow187 MW
- PV Park Boitzenburger Land159 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.