Permit notice · Rotterdam, South Holland, Netherlands
Solar park omgevingsvergunning draft decision, Rotterdam (gmb-2024-525623)
Solar park omgevingsvergunning draft decision, Rotterdam (gmb-2024-525623) is a permit notice in Rotterdam, South Holland, Netherlands, published 13 Dec 2024.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Rotterdam | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Permit date | 13 Dec 2024 (omgevingsvergunning) | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Notice type | Draft decision | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Technology | Solar | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Coordinates | 51.9493, 4.5266 | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
Research on this permit notice and its holder.Who holds it up to the parent company, the decision and the asset it is for, and an introduction to the holder.
Request researchLatest events
Dated events about this permit notice from official notices and registers, newest first. All recent changes.
- Draft decision (environmental permit) · source
Nearby
Within 50 km of this permit notice: 591 power plants (469 operating, 10,225 MW), 157 substations, 87 CO2 emitters (47 operating), 66 data centers and 2 processing plants, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| 150 kV Rotterdam Ommoord | Substation | — | — | 0.7 km |
| Solar Rotterdam (Urbi Investment 2 Sub B) | Power plant | 1.01 MW | Cancelled | 0.9 km |
| Solar Rotterdam (Eneco Solar) | Power plant | 1.22 MW | Operating | 2.4 km |
| Centrale RoCa | Power plant | 264 MW | Operating | 3.1 km |
| Geothermal heat Bergschenhoek (Yeager Energy Bergschenhoek Holding) | CO2 emitter | — | Permitted | 4.5 km |
| Geothermal heat Bergschenhoek (Yeager Energy Bergschenhoek Holding) | CO2 emitter | — | Permitted | 4.8 km |
| Electric boiler Rotterdam (Air Liquide Industrie) | CO2 emitter | — | Cancelled | 5.3 km |
| NorthC Rotterdam Zestienhoven 1&2 | Data center | — | — | 5.4 km |
| 150 kV Rotterdam Centrum | Substation | — | — | 6.8 km |
Place
Other permit notices in South Holland
- Battery storage omgevingsplan application, Midden-Delfland (gmb-2026-166439)
- Battery storage omgevingsplan application, Nieuwkoop (gmb-2026-286452)
- Battery storage omgevingsplan application, Rotterdam (gmb-2026-427260)
- Battery storage omgevingsplan decision, Kaag en Braassem (gmb-2025-123830)
- Battery storage omgevingsplan decision, Kaag en Braassem (gmb-2026-395920)
- Battery storage omgevingsplan decision, Lisse (gmb-2026-93012)
- Battery storage omgevingsplan decision, Midden-Delfland (gmb-2026-210961)
- Battery storage omgevingsplan decision, Nieuwkoop (gmb-2026-346519)
Data on this page
- JRC Open Power Plants Database (JRC-PPDB-OPEN), European Commission, Joint Research Centre. JRC Open Power Plants Database (JRC-PPDB-OPEN), CC BY 4.0.
- Dutch power station owners' and operators' pages. Dutch power station owners' and operators' pages, Facts only, each linked to its page.
- Officiële Bekendmakingen. Officiële Bekendmakingen, CC0 1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.