Permit notice · Meierijstad, North Brabant, Netherlands
Groundwater abstraction watervergunning application, Meierijstad (wsb-2026-267)
Groundwater abstraction watervergunning application, Meierijstad (wsb-2026-267) is a permit notice in Meierijstad, North Brabant, Netherlands, published 7 Jan 2026.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Meierijstad | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Permit date | 7 Jan 2026 (watervergunning) | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Notice type | Application | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Technology | Groundwater abstraction | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Coordinates | 51.6424, 5.4175 | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
Research on this permit notice and its holder.Who holds it up to the parent company, the decision and the asset it is for, and an introduction to the holder.
Request researchLatest events
Dated events about this permit notice from official notices and registers, newest first. All recent changes.
- Permit applied for (water permit) · source
Nearby
Within 50 km of this permit notice: 638 power plants (488 operating, 4,121 MW), 78 substations, 68 CO2 emitters (41 operating) and 9 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Biomass Schijndel (Houtindustrie Schijndel Onroerend Goed) | Power plant | 8.8 MW | Operating | 1.5 km |
| Solar Sint-Oedenrode (Zonneweide Brabantenergie 1) | Power plant | 9.13 MW | Operating | 5.0 km |
| Solar Schijndel (Berco Holding) | Power plant | 1.11 MW | Operating | 5.1 km |
| 150 kV Eerde | Substation | — | — | 6.4 km |
| Interconnect Den Bosch | Data center | — | — | 7.1 km |
| Biomass heat Veghel (Mars Nederland) | CO2 emitter | — | Operating | 7.7 km |
| Electric boiler Veghel (Mars Nederland) | CO2 emitter | — | Operating | 7.7 km |
| Green gas Sint-Oedenrode (Landbouwbedrijf Groene Woud) | CO2 emitter | — | Operating | 8.5 km |
| 150 kV Boxtel | Substation | — | — | 9.9 km |
Place
Other permit notices in North Brabant
- Battery storage omgevingsplan application, Bergeijk (gmb-2025-54004)
- Battery storage omgevingsplan application, Reusel-De Mierden (gmb-2026-479275)
- Battery storage omgevingsplan decision, Bergeijk (gmb-2025-256724)
- Battery storage omgevingsplan decision, Gemert-Bakel (gmb-2026-211754)
- Battery storage omgevingsplan decision, Laarbeek (gmb-2025-567631)
- Battery storage omgevingsplan decision, Oisterwijk (gmb-2025-573841)
- Battery storage omgevingsvergunning application, 's-Hertogenbosch (gmb-2026-438078)
- Battery storage omgevingsvergunning application, Altena (gmb-2026-248644)
Data on this page
- Officiële Bekendmakingen. Officiële Bekendmakingen, CC0 1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.