Permit notice · Lelystad, Flevoland, Netherlands
Nitrogen natuurvergunning draft decision, Lelystad (prb-2025-6044)
Nitrogen natuurvergunning draft decision, Lelystad (prb-2025-6044) is a permit notice in Lelystad, Flevoland, Netherlands, published 15 Apr 2025.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Lelystad | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Permit date | 15 Apr 2025 (natuurvergunning) | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Notice type | Draft decision | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Technology | Nitrogen | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
| Coordinates | 52.5716, 5.3217 | Officiële Bekendmakingen · record · CC0 1.0 · checked 24 Oct 2026 |
Research on this permit notice and its applicant.Who is behind it up to the parent company, the decision and the asset it is for, and an introduction to the applicant.
Request researchLatest events
Dated events about this permit notice from official notices and registers, newest first. All recent changes.
- Draft decision (nature permit) · source
Nearby
Within 50 km of this permit notice: 387 power plants (317 operating, 6,936 MW), 79 substations, 77 data centers, 55 CO2 emitters (33 operating), 2 AI supercomputers and 1 processing plant, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Solar Lelystad (Werkcon Beheer) | Power plant | 1.2 MW | Planned | 11 km |
| Solar Lelystad (Werkcon Beheer) | Power plant | 1 MW | Operating | 12 km |
| Solar Venhuizen (One Solar XI) | Power plant | 1.04 MW | Operating | 12 km |
| Biomass heat Lelystad (Primco BMC Lelystad) | CO2 emitter | — | Operating | 14 km |
| ENGIE Maximacentrale | CO2 emitter | 1,216,922 tCO2e | — | 14 km |
| 150 kV Lelystad | Substation | — | — | 14 km |
| 380 kV Lelystad | Substation | — | — | 15 km |
| 150 kV Zuiderveld | Substation | — | — | 15 km |
| Heat pump Bovenkarspel (C.N.B.) | CO2 emitter | — | Planned | 16 km |
Place
Other permit notices in Flevoland
- Battery storage omgevingsplan application, Urk (gmb-2025-265888)
- Battery storage omgevingsvergunning application, Noordoostpolder (gmb-2026-178677)
- Battery storage omgevingsvergunning application, Noordoostpolder (gmb-2026-490317)
- Battery storage omgevingsvergunning application, Noordoostpolder (gmb-2026-65684)
- Battery storage omgevingsvergunning application, Noordoostpolder (gmb-2026-94424)
- Battery storage omgevingsvergunning decision, Noordoostpolder (gmb-2025-389626)
- Battery storage omgevingsvergunning decision, Noordoostpolder (gmb-2026-485841)
- Battery storage omgevingsvergunning decision, Noordoostpolder (gmb-2026-82285)
Data on this page
- European Commission, Union Registry. EU Union Registry public data, CC BY 4.0.
- Officiële Bekendmakingen. Officiële Bekendmakingen, CC0 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.